- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
资料员专业管理实务(10-11节)(Professional management practices for Librarians (section 10-11))
资料员专业管理实务(10-11节)(Professional management practices for Librarians (section 10-11))
Second relevant knowledge and regulations and regulatory documents
The tenth section is the outline of engineering construction procedure and management
I. radio
1, the organization can not be independent construction (sub project).
2, the construction units in the process of construction of the document is (construction documents).
3, within 3 months after the completion of the acceptance of the project, the 1 sets of engineering documents that meet the requirements of the standards and standards shall be handed over to the urban construction archives and handled with the urban construction archives, which will be the responsibility of the construction units.
4, a city construction group received a project general contracting qualification, the unit wants to part of the project subcontracted, and reported to the construction unit accreditation, not subcontracting option is (main project).
5, (Project Manager) is a construction enterprise appointed project construction project management team leader.
6, do not belong to the project units (option is to have economic disputes arbitration when the construction of the main unit).
7, (supervision units) should be responsible for construction units submitted to the construction materials for review, signature.
8, the project feasibility study report approval, approval of major construction projects feasibility study unit should be (National Development and Reform Commission, reported to the State Council).
9, the project that must be open for bidding is the construction of a hydropower station using full loans from the Bank of asia.
10, state-owned enterprises and institutions in the operation of large and medium-sized construction projects, we must establish a project at the construction phase of the legal person. The establishment of a project legal person can be realized through the formation of a company, and the articles of Associatio
您可能关注的文档
- 离心泵材质选型(Material selection of centrifugal pump).doc
- 离职前单位要管理求先填申请书(Before leaving the unit to fill out the application for management).doc
- 种子介绍(Seed introduction).doc
- 种植专用em菌种发酵液在种植业的使用方法(Method for using fermentation liquid of EM strain specially used in planting).doc
- 种鸽的保养(Pigeon maintenance).doc
- 秦征百越(Qin Baiyue syndrome).doc
- 秘书考试4(Secretarial exam 4).doc
- 秘神秘的心灵感应(Secret mystical telepathy).doc
- 秦皇岛导游词(Qinhuangdao guide words).doc
- 秭归县庙垭村小康建设情况调查(Investigation on well-off construction of temple village in Zigui County).doc
- 北师大版小学数学三年级上册《寄书》教学设计.docx
- 统编版(部编版)语文二年级上册《雪孩子》教学设计.docx
- 统编版(部编版)语文二年级上册《八角楼上》教学设计.docx
- 北师大版小学数学三年级上册《长方形周长》教学设计.docx
- 北师大版小学数学三年级上册《丰收了》教学设计.docx
- 统编版(部编版)语文二年级上册《夜宿山寺》教学设计.docx
- 统编版(部编版)语文二年级上册《风娃娃》教学设计.docx
- 统编版(部编版)语文二年级上册《朱德的扁担》教学设计.docx
- 统编版(部编版)语文二年级上册《难忘的泼水节》教学设计.docx
- 统编版(部编版)语文二年级上册《纸船和风筝》教学设计.docx
文档评论(0)