室内给水管道安装(Installation of indoor water supply pipe).doc

室内给水管道安装(Installation of indoor water supply pipe).doc

  1. 1、本文档共21页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
室内给水管道安装(Installation of indoor water supply pipe)

室内给水管道安装(Installation of indoor water supply pipe) Installation of indoor water supply pipe This chapter applies to civil and general industrial building water supply pipes (including hot water pipes for water supply cast iron pipes and galvanized carbon steel tubes) Engineering. 1 material requirements 1.1 cast iron pipe and pipe fittings specifications should comply with the design requirements of pressure, wall thickness uniformity, smooth and clean, no blisters, Cracks, bristles and knots; the inner and outer diameters of the spigot and socket and the fittings shall be in good shape; the anticorrosive coating on the inner and outer surfaces shall be neat and even Solid. Both pipe and fittings should have factory certificate. 1.2 galvanized carbon steel pipe and pipe fittings of the specifications should be consistent with the design requirements, galvanized pipe inside and outside the uniform, no corrosion, no flying thorn. tube No partial deduction, arbitrary deduction, incomplete or inaccurate thread angle phenomenon. Both pipe and fittings should have factory certificate. 1.3 water meter specifications should comply with the design requirements and the water company confirmed, hot water system to meet the temperature requirements of the hot water meter. surface The shell casting rules, no blisters, cracks, table glass cover damage, seal integrity, factory certification. 1.4 valve specifications, models should meet the design requirements, hot water system valve meets the temperature requirements. The body is cast with a clean surface, No cracks, flexible shape, close tight, packing seal intact, no leakage, hand wheel intact, no damage, there is a factory certificate. 2. main machines and tools 2.1: mechanical threading machine, wheel saws, bench drill, electric hammer, electric drill, electric welding machine, electric pressure test pump. 2.2 sets of tools: wire board, Guan Qian, pressure pliers, hand saw, hammer, wrench, pliers, chain bending machine, hand p

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档