室内塑料排水管道安装施工方案1(Indoor plastic drainage pipe installation program 1).doc

室内塑料排水管道安装施工方案1(Indoor plastic drainage pipe installation program 1).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
室内塑料排水管道安装施工方案1(Indoor plastic drainage pipe installation program 1)

室内塑料排水管道安装施工方案1(Indoor plastic drainage pipe installation program 1) This article is contributed by liyunweb DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. Indoor plastic drainage pipe installation scheme, indoor plastic drainage pipe installation construction scheme construction 1 material requirements: 1.1 pipe is rigid polyvinyl chloride (UPVC). The adhesive used shall be the same product in the same factory. It shall be suitable for sanitary fittings, and shall have the product qualification certificate and instruction manual. 1.2 pipe outside surface should be smooth, no bubbles, cracks, wall thickness, consistent color 2.1.3 other materials: adhesives, steel, round steel, card, bolts, nuts, soap etc.. 2.2 main equipments: 2.2.1 electric drill, impact drill, hand saw, milling mouthparts, steel scraper, wrench, hammer, horizontal ruler, threading plate, brush, cloth, wire, etc.. 2.3, operation conditions: 2.3.1 buried pipe, should dig groove, groove to flat, must have slope, ditch bottom ramming. 2.3.2 concealed piping (including equipment, shaft, ceiling pipe) should first check the elevation of various pipelines, coordinate arrangement, whether there is no contradiction. Reserved holes have been completed with embedded parts. The civil formwork has been removed, the operation site has been cleaned up and the installation height is over 3.5m. A good shelf should be erected. 2.3.3 indoor installation piping shall be installed at intervals of two layers from the progress of the structure. Indoor horizon should be good, early decoration plastering project has been completed. Installation site accessibility. 3, operation process 3.1 process: ready to install, prefabrication, installation, pipe riser installation, pipe installation, card, fixed sealing plugging hole, closed water test, water test 3.2 prefabrication: according to drawings and combined with the act

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档