室内采暖管道安装工程技术交底_secret(Technical explanation of indoor heating piping installation _secret).doc
- 1、本文档共22页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
室内采暖管道安装工程技术交底_secret(Technical explanation of indoor heating piping installation _secret)
室内采暖管道安装工程技术交底_secret(Technical explanation of indoor heating piping installation _secret)
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
Net, water and electricity free download
A,
One
Construction preparation
Dry pipe installation: located in the trunk of the dry pipe, should be cleared of debris in the trench, and install the hanging crane, card rack, not covered ditch cover before installation. A dry pipe located below the floor and at the top shall be installed after the top of the structure or above the first floor of the installation. 2., 3.1, 2, 3, standpipe installation must be carried out after determining the correct elevation. The installation of branch pipe must be done after plastering. Pipe: carbon steel tube, seamless steel tube. Pipe material shall not be bent or rusted without flying thorns, heavy leather and uneven surface. Fittings: unbiased buckle, square buckle, disorderly buckle, broken wires, no blisters, cracks and inaccurate angles phenomenon. The valve casting rules, no burr, no crack, flexible switch tight, thread without damage, the straightness and the right angle, the strength meets the requirement, the hand wheel without damage. Installation should be carried out before the strength and tightness test, the main control valve 100% test, other valve sampling 10%, if not qualified, then check 20%, there are substandard, then one by one inspection. 4, 5, 6, and other materials: steel, round steel, pipe clips, bolts, nuts, oil, hemp, mats, electrical welding rod, etc.. Selection should comply with the design requirements. The cast iron shut-off valve is not allowed in the interior part of the housing project. Various types of pipes, valves, regulators, insulation materials should be product quality certificate and material inspection report, heat meter should have measurement verification certificate.
(I) operating conditions
(two) mate
您可能关注的文档
- 天涯来吧 - 驾驶 - 七种技巧轻松停车(End of the world come - drive - seven skills, easy parking).doc
- 天然的化妆品、护肤品知识大全(Natural cosmetics and skin care products.).doc
- 天线溃电点计算(Calculation of breakdown point of antenna).doc
- 天线的基础知识(Basic knowledge of antennas).doc
- 天语指令(Amagatarai instruction).doc
- 太原客运段防寒过冬安全题库(Taiyuan winter passenger depot cold winter safety item bank).doc
- 太原市将采用城市集中供热节能服务系统(Taiyuan city will use the central heating energy-saving service system).doc
- 太子参种植新技术(The new planting techniques of Radix Pseudostellariae).doc
- 太极相对论(Tai Chi theory of relativity).doc
- 太阁立志传5 特殊武将卡获得(II taikourisshiden 5 special generals cards).doc
最近下载
- 创建三级医院知识培训幻灯片.ppt VIP
- 哈尔滨工业大学制造系统自动化大作业——搬运机械手运动控制系统设计规划.pdf
- 2024年四川省成都市中考物理真题卷(含答案与解析).pdf VIP
- 2024年湖南华容县事业单位招聘专业技术人员历年公开引进高层次人才和急需紧缺人才笔试参考题库(共500题)答案详解版.docx
- 地灾工程施工质量验收用表.doc
- 《我们奇妙的世界》作业设计.docx VIP
- 燃气公司生产安全标准化手册资料.pdf VIP
- 土方运输方案完整版.docx
- 化工原理课程设计-丙烯丙烷精馏塔及其辅助设备的工艺设计.pdf
- 闽南师范大学2022-2023学年《植物生理学》期末考试试卷(A卷)含参考答案.docx
文档评论(0)