采暖管道过河直埋施工方案设计(The design and construction scheme of heating pipes buried across the river).docVIP

采暖管道过河直埋施工方案设计(The design and construction scheme of heating pipes buried across the river).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
采暖管道过河直埋施工方案设计(The design and construction scheme of heating pipes buried across the river)

采暖管道过河直埋施工方案设计(The design and construction scheme of heating pipes buried across the river) This paper contributed by zhang841024. Doc document may at the WAP end of the browsing experience poor. Suggest you select TXT, or download the source file to the machine view. The river buried construction scheme design of pipeline heating pipe heating pipeline across the river In this section of thirty-one meters across the river, save time for saving across the river and Hun River project investment, by way of laying the buried river. The river buried, in the trench excavation, laying, water and other issues with the general buried there is a certain difference, not in accordance with the conventional methods to solve the problem. So we set up the project team of technical demonstration, put forward the following solutions (water pipe with buried prefabricated polyurethane insulation pipe, steel structure work for polyurethane foam insulation layer + + high density polyethylene outer shell): construction time in the conditions allow, should try to choose in the dry season, the river water level low, convenient construction, small difficulty of closure. Because the pipeline across the river bottom laying, so a special construction content: laying sewer, cofferdam, cofferdam in the. The closure by cofferdam in two steps, as shown in Fig. Shown: Diagram of the first section construction Schematic diagram of Construction Second The following specific construction plan: The construction scheme of river engineering pipeline, construction preparation before 1, before the construction of the ground, dealing with slotted range underground obstacles for verification, itemized inventory barrier structure, and the relative position of network engineering. 2, according to the design planning red line, determine each excavation width according to the sloping coefficient 1:1.25. 3, before excavation, must first measure on line measurement, elevation, in the excavation construction proces

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档