模具总装图的技术要求内容(Requirements of the technical content of the mold assembly diagram).docVIP

模具总装图的技术要求内容(Requirements of the technical content of the mold assembly diagram).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
模具总装图的技术要求内容(Requirements of the technical content of the mold assembly diagram)

模具总装图的技术要求内容(Requirements of the technical content of the mold assembly diagram) Requirements of the mold assembly diagram the technical content of 2009-01-04 00:201. performance requirements for certain system of mold. For example, the roof system, slide block core pulling structure assembly requirements. 2. of the mold assembly process requirements. For example, after the mold assembly type of joint surface fitting clearance should be parallel degree less than 0.05mm, the mold, and pointed out that the decision by the assembly of the size and size requirements. 3. die, assembly and disassembly method. 4. anti oxidation treatment, mold numbering, lettering, marking, seal, custody and other requirements. 5. mold testing and inspection requirements. Seven, all parts of the map drawing From the mold assembly drawing part drawing order should be: after the first period, complex to simple, first molded parts, structure parts. 1. graphics requirements: must be drawn to scale, allowed to enlarge or shrink. Reasonable choice view is correct, reasonable arrangement. In order to make the process easy to understand, easy to assemble, patent, graphics as far as possible with the assembly drawing, graphics should be clear. The 2. dimension requirements of uniform and centralized and orderly and complete. Dimension order: first standard size of the main parts and the molds angle, marked with the size, and then mark all size. The first marked with the size in the main parts of the map, after marking all dimensions. 3. surface roughness. The application of the most a roughness mark in the upper right corner of the drawings, such as marked the remaining 3.2. Other roughness symbols were labeled in various surface parts. 4. other content, such as mold drawing number, part name, material, heat treatment and hardness, surface treatment, graphic proportion, free size processing precision, technical specifications will be completed correctly. Eight. Proofreading, map, tracing, send the

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档