- 1、本文档共23页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
法律实务模拟一4(Legal practice simulation 4)
法律实务模拟一4(Legal practice simulation 4)
In the high school
(three) case analysis problem
(three) case analysis problem (a total of 25 questions, 2 points for each question. Composed of single or multiple selections. Wrong, not less, but the choice of score; each option right 0.5 points.)
(a)
A air compressor fittings factory salesman to sell Steel Corp B intercooler factory production of other products. After consultation, the Steel Corp to buy B from a air compressor fittings factory two sets for intercooler of blast furnace blower. Because the middle cooler a air compressor fittings factory production does not fully comply with the B requirements of the Steel Corp, the Steel Corp B requirements according to their drawings provided by the production of a air compressor fittings factory agreed. B Steel Corp to a air compressor fittings factory to pay in advance 1
000 yuan, and 5000 yuan of liquidated damages. The two sides signed a contract for this.
61, the drafting of the terms of the contract, the required terms ().
A, the name or name and domicile;
B, standard; quantity; quality; price or remuneration;
C, the time limit for performance, place and manner;
D, the contract effectiveness of different text terms
Answer: ABC
Analysis: according to the provisions of the contract law, the contract generally includes the following provisions: the names of the parties
And domicile; subject; quantity; quality; price or remuneration; the time limit for performance, place and manner; liability for breach of contract; dispute settlement method.
62, B Steel Corp to a air compressor fittings factory of the pre paid 1000 yuan of property is ().
A, deposit
B, prepaid
C, deposit or advance payment
D, both sides need to clear the nature of the parties in the contract
Answer: D
The deposit is similar with the advance, but to determine the nature of the parties in the contract clearly
63, if according to the parties clearly agreed in the contract for 1000 yuan deposit, when the a air c
您可能关注的文档
- 欢乐足球攻略(Happy football introduction).doc
- 欣赏一道高考题的数学美(Enjoy a college entrance examination mathematics beauty).doc
- 欧怡青回归的条件(Ou Yiqing's condition).doc
- 欧洲篮球四大赛事(The four European basketball tournament).doc
- 植物识别-景观的根基(The foundation of plant landscape recognition).doc
- 歌曲高音进阶曲目(The song advanced soprano repertoire).doc
- 歌月十夜攻略(The song ten night Raiders).doc
- 歌词的写法(Lyrics).doc
- 正宗兰州牛肉拉面的制作方法(Method of making authentic Lanzhou Hand-Pulled Noodle Soup with Beef.).doc
- 正宗逍遥镇糊辣汤(Authentic xiaoyaozhen spicy soup).doc
- 2025中国冶金地质总局所属在京单位高校毕业生招聘23人笔试参考题库附带答案详解.doc
- 2025年01月中国人民大学文学院公开招聘1人笔试历年典型考题(历年真题考点)解题思路附带答案详解.doc
- 2024黑龙江省农业投资集团有限公司权属企业市场化选聘10人笔试参考题库附带答案详解.pdf
- 2025汇明光电秋招提前批开启笔试参考题库附带答案详解.pdf
- 2024中国能建葛洲坝集团审计部公开招聘1人笔试参考题库附带答案详解.pdf
- 2024吉林省水工局集团竞聘上岗7人笔试参考题库附带答案详解.pdf
- 2024首发(河北)物流有限公司公开招聘工作人员笔试参考题库附带答案详解.pdf
- 2023国家电投海南公司所属单位社会招聘笔试参考题库附带答案详解.pdf
- 2024湖南怀化会同县供水有限责任公司招聘9人笔试参考题库附带答案详解.pdf
- 2025上海烟草机械有限责任公司招聘22人笔试参考题库附带答案详解.pdf
文档评论(0)