混凝施工质量缺陷处理(Mixed construction quality defect treatment of coagulation).docVIP

混凝施工质量缺陷处理(Mixed construction quality defect treatment of coagulation).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
混凝施工质量缺陷处理(Mixed construction quality defect treatment of coagulation)

混凝施工质量缺陷处理(Mixed construction quality defect treatment of coagulation) The causes and treatment methods of appearance defects of cement concrete Release date: 05-15 Pages: 1 A: the quality of earthwork compaction test of the (two) A reinforced soil retaining wall construction and highway Causes and treatments of 1. concrete surface cracks Causes of cracks in the concrete surface is complex and there. In the process of construction, concrete cracks caused by shrinkage often occurs. There are two main reasons: one is because just completed pouring concrete surface moisture rapid evaporation of surface cracks; two is because the hardening of concrete, the temperature difference between the interior and exterior of concrete cracks and excessive. Cement concrete pouring completed just outside often because of high temperatures, relative humidity is too small, the surface rapid evaporation of the surface to dry, but the inside is still plastic, because plastic shrinkage too quickly and make the surface cracks. The crack causes irregular small, discontinuous, and rarely have general diagonal diagonal edge in length, usually no more than 30 CZ no for this reason crack prevention 7b method is to take measures in the concrete cover pouring surface, so as to avoid the wind and sun, after the concrete pouring immediately the surface coverage and timely watering The volume of concrete should be poured in layers. In the process of the upper concrete pouring, in concrete under the action of gravity settlement. When not at the beginning of the concrete before the final set this time, if the reinforced or template connecting bolts and other objects, this phenomenon will be thwarted settlement cracks. Especially when the template does not exist to smooth or paint remover is not uniform, the template will prevent friction settlement and cracks in the vertical surface of concrete. The hydration heat of cement concrete will produce and release in the hardening process, the internal temp

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档