- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
第二次作业答案(国际贸易实务)答案(Second homework answer (International Trade).)
第二次作业答案(国际贸易实务)答案(Second homework answer (International Trade).)
Question 1, 2.5 points, 2.5 points
Three, radio questions:
1. international trade practices relating to international trade terms are mainly ()
The answer: D and above
Question 2, 2.5 points, 2.5 points
2. in the 2000 General principles, the buyer is responsible for handling the export formalities
Selected answers: B, EXW;
Question 3, 2.5 points, 2.5 points
3., in accordance with the general provisions of the 2000 explanation, the use of CIP conditions clinch a deal, buyers and sellers risk demarcation is ()
Selected answer: C, port of shipment, ships side;
Question 4, 2.5 points, 2.5 points
4. in accordance with the interpretation of the 2000 General principles, freight paid to means ()
Selected answers: D, CPT
Question 5, 2.5 points, 2.5 points
Two, individual choice questions:
1. marine transport is characterized by:
The answer: D, slow transportation
Question 6, 2.5 points, 2.5 points
2. liner freight includes:
Selected answer: A, basic freight + surcharge
Question 7, 2.5 points, 2.5 points
3., the most common way to specify the time of loading and unloading is:
The answer: C, 24 hours of good weather, working days
Question 8, 2.5 points, 2.5 points
4. the following is the date on which the shipped B / L is indicated
The selected answer: B, the goods in June 4th all installed
Question 9, 2.5 points, 2.5 points
5. in international goods transportation, the transport document that can act as the document of title:
Selected answers: B, marine bills of lading
Question 10, 2.5 points, 2.5 points
6. an expired bill of lading means a bill of lading which is negotiated by the seller over the date stipulated in the letter of credit or after the date of issue of the bill of lading.
The answer: A, 21 days
Question 11, 2.5 points, 2.5 points
5. L / C and so forth
The selected answer: B, the issuing bank
Question 12, 2.5 points, 2.5 points
Four 、 judgment questions
1, only a bank acceptance bill can be discount
您可能关注的文档
- 研发中心(R & D Center).doc
- 研发人员激励的合理组合(Reasonable combination of R & D personnel incentive).doc
- 研发人员的职业化与职业素养(Occupation and occupation accomplishment of R & D personnel).doc
- 研发人员的素质(R & D personnel quality).doc
- 研发人员职业素养(R & D personnel occupation accomplishment).doc
- 研发多项目管理(The development of multi project management).doc
- 研发人才培养与汽车自主品牌建设(With the construction of automobile brand culture of R & D personnel).doc
- 研发多项目管理培训班(北京,6月27-28日)(The development of multi project management training (Beijing, June 27-28)).doc
- 研发型项目特点(The characteristics of the research project).doc
- 研发具有的能力(With the development of ability).doc
- 2025年中国刚性建筑用胶行业市场规模及投资前景预测分析报告.docx
- 中国建材类陶瓷行业市场前景预测及投资价值评估分析报告.docx
- 2025年服装市场调研报告总结.docx
- 2025年机床数控系统研究分析报告.docx
- 中国厕所隔断行业市场前景预测及投资价值评估分析报告.docx
- 中国快速加热电水壶行业市场前景预测及投资价值评估分析报告.docx
- 2025年幼儿园老师个人工作实习报告(五).docx
- 全球及中国1,4-丁二醇(bdo)行业调研及投资前景分析报告-2025-2027.docx
- 2025年煤矿类实习报告4_19.docx
- 2025年中国加热管行业市场前景预测及投资价值评估分析报告.docx
文档评论(0)