16-砖混结构构造柱、圈梁、板缝支模(16- brick concrete structure pole, beam, slab formwork).docVIP

16-砖混结构构造柱、圈梁、板缝支模(16- brick concrete structure pole, beam, slab formwork).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
16-砖混结构构造柱、圈梁、板缝支模(16- brick concrete structure pole, beam, slab formwork)

16-砖混结构构造柱、圈梁、板缝支模(16- brick concrete structure pole, beam, slab formwork) Brick concrete structure pole, beam, slab formwork 1 range The technology standard is mainly used in industrial and civil buildings, brick masonry structure with the external mold plate mold structure pole, beam, slab formwork. 2 construction preparation 2.1 materials and main equipment: 2.1.1 board (thickness of 20 ~ 50mm), stereotypes combination steel formwork (length 600, 750, 900, 1200, 1500mm, width 100, 150, 200, 250, 300mm), yin and yang angle mold, connection angle die. 2.1.2 wood, wedges, support (wood or steel), shape composite steel accessories (U shaped card, L shaped bolt, 3 disc shaped fastener, fastener, bolt, bolt hook, fastening bolts), wire (12 ~ 14), separant. 2.1.3 drilling drill, spanner, pliers. 2.2 operating conditions 2.2.1 play wall +50cm horizontal line, check the brick wall (or concrete wall) whether the position of the character line, for pre screening procedures. The 2.2.2 constructional column is reinforced with lashing and finished the hidden inspection procedure. The 2.2.3 template for the bolt rod through the wall, brick should be required to reserve the bolt hole. 2.2.4 check whether the columns are clean, including brick walls, tongue ashes, mortar on steel bars and floor ashes at the end of the column. 3 operation process 3.1 process: Support constructional column template Dead work To Support beam template To Do pre A template slot 3.2 die before the structural column, beam and slab joints of all debris clean up. 3.3 templates: 3.3.1 structural column template: 3.3.1.1 brick concrete structure column template, may use the wooden template or the shape combination steel template. General formwork method can be used. As the template expansion to prevent pouring concrete, influence of exterior wall smooth, with wood or composite steel formwork affixed to the outer wall, and at intervals of less than 1m is provided with two brace, brace and the inner wall of R

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档