2011年造价员考试土建工程模拟试题及答案汇总1(2011 cost engineer exam civil engineering simulation questions and answers summary 1).docVIP

2011年造价员考试土建工程模拟试题及答案汇总1(2011 cost engineer exam civil engineering simulation questions and answers summary 1).doc

  1. 1、本文档共35页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2011年造价员考试土建工程模拟试题及答案汇总1(2011 cost engineer exam civil engineering simulation questions and answers summary 1)

2011年造价员考试土建工程模拟试题及答案汇总1(2011 cost engineer exam civil engineering simulation questions and answers summary 1) Cost engineer exam civil engineering simulation questions and answers summary in 2011 A single storey building with a height of less than (B) within 1. meters, without calculating the floor space. (equipment, piping, mezzanine) A.1.1m B.2.2m C.3.0m D.2.5m 2. the following building area calculation error is D A. the balcony of a building shall be calculated at the 1/2 of its horizontal projection area. B. the top of the building has an enclosure staircase, a water tank, an elevator room, etc. the floor area shall be calculated at 2.20M and above C. the deformation joints in the building shall be calculated in the area of the building in combination with their natural layers. D. closed balcony should be calculated according to its horizontal projection area 3. below, the building area is not calculated according to the natural layer of the building (D) A. indoor staircase, ventilation and exhaust shaft B. elevator shaft, sightseeing lift shaft, waste Road C. lift well, pipeline well, wall chimney D. outdoor stairs 4. construction plan budget is in the (B) stage to determine the project cost document: (D) A. scheme design B. preliminary design C. technology design D. construction drawing design 5., Zhejiang budget for construction projects, reflecting (D) level A. average advanced B. average reasonable C. advanced enterprise D. social averages 6. budget for construction projects in Zhejiang does not apply to (D) A. new construction B. expansion project C. reconstruction project D. construction works 7. construction materials. Finished products. Two handling charges for semi-finished products are included (C), unless otherwise specified. A. material price B. material budget price C. construction organization measures fee D. technical measures fee 8. the height of the building in the quota refers to the height of the building (C) to the bottom of the building. A

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档