- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
pe管径选择(PE diameter)
pe管径选择(PE diameter)
PE pipeline has the characteristics of easy construction, fast speed, corrosion resistance, no pollution and long service life. There are two main ways of PE pipe connection: hot melt connection and electrofusion connection. PE pipe diameter is greater than 90MM by hot melt can be fused, different grades, grades of polyethylene materials for the manufacture of pipe fittings or equal to the outer diameter of different diameter pipe fittings must be used welding connection. Outer diameter of less than or equal to 63MM, and other materials, pipes, valves and accessories connections, the use of plastic steel transition joint connection, greater than 63MM flange connection. When the bending radius is greater than or equal to 25 times the outer diameter of the pipe, it can be bent with natural flexibility. Hot melt connection principle is with the two PE pipeline surface heating up close to its smooth surface until the melt in the heating tool, remove the heating tool, will face close to two melt together, to maintain joint cooling under pressure to form a whole.
Connecting steps to the welding machine:
Welding preparation. The preparatory work for hot melt welding is as follows:
Slip the slip with the specification of the pipe into the rack;
Prepare sufficient support to ensure that the pipe to be welded can be at the same height as the center line of the frame and be easy to move;
Set the heating temperature 200 ~ 230 degrees (the data in Hangzhou Machinery Factory supply water machine for reference, the specific temperature to the data provided by the manufacturer.);
Switch on the power supply of the welding machine, turn on heating plate, milling cutter and oil pump switch, and test operation.
Two, welding. The welding process is as follows: check and clean the pipe, pipe, tube end fastening milling pipe end, check the pipe end clearance, dislocation and heating pipes and observe the minimum edge height, pipe welding and cooling to the required tim
您可能关注的文档
- css2.1关键字索引(The css2.1 keyword index).doc
- cs营销运作三大法宝(CS Marketing three magic).doc
- cs神狙是这样练成的(CS is such a god spy).doc
- culture shock(文化冲击).doc
- cz系列冲击钻使用说明(CZ series impact drill instructions).doc
- csr蓝牙立体声耳机参考设计支持mp3媒体流(CSR Bluetooth stereo headset reference design supports MP3 media stream).doc
- c型钢规格型号及理论重量(C type steel specifications and theoretical weight).doc
- c语言函数库-第六章(时间和日期函数)(C language library - Chapter sixth (the time and date function)).doc
- c语言练习经典23题-附答案(C language classic 23 - exercises with answers).doc
- d18通麦到鲁朗(D18 Tangmai to Rouland).doc
- DB44_T 2611-2025 城市排水管网有毒有害气体监测与风险分级管理技术标准.pdf
- DB44_T 2612-2025 竞赛类科普活动策划与实施服务规范.pdf
- DB43_T 2947-2024 烟草种子质量控制规程.pdf
- DB37_T 4836-2025 煤矿风量实时监测技术要求.pdf
- 叉车防撞系统,全球前22强生产商排名及市场份额(by QYResearch).docx
- 超滤膜,全球前18强生产商排名及市场份额(by QYResearch).docx
- DB62T 4172-2020 玉米品种 酒623规范.pdf
- DB62T 4160-2020 在用真空绝热深冷压力容器综合性能在线检测方法.pdf
- DB62T 4164-2020 辣椒品种 酒椒1号.pdf
- DB62T 4133-2020 公路隧道地质超前预报机械能无损探测技术规程.pdf
最近下载
- 某化工厂现场应急处置方案(58个).pdf VIP
- MBR运行调试及维护.doc VIP
- 新目标(第二版)视听说B3U7 测试试卷答案.pdf VIP
- 论工厂设备详细搬迁方案.doc VIP
- 2025年公需课《人工智能赋能制造业高质量发展》试题及答案.doc VIP
- DB5307T59-2024丽江市城市暴雨强度公式.pdf VIP
- aqt3049—2013危险与可操作性分析hazop分析应用导则.doc VIP
- 物流运输企业成本结构分析(详细).docx VIP
- 心力衰竭患者利尿剂抵抗诊断及管理中国专家共识2024解读.pptx
- 课题申报书:人工智能赋能高职院校学生就业能力提升的路径研究.docx VIP
文档评论(0)