井巷施工技术(The construction technology of roadway).docVIP

井巷施工技术(The construction technology of roadway).doc

  1. 1、本文档共27页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
井巷施工技术(The construction technology of roadway)

井巷施工技术(The construction technology of roadway) Theoretical questions section I. judgment [F] 1, gas is produced from underground coal and surrounding rock, and methane gas produced in the process of production. [F] 2, void ratio is the total amount of pore and fissure volume in rock, which is the percentage of total volume of rock. [T] 3. The elastic deformation of rock means the deformation of rock under external force. The deformation of rock can be completely recovered when the external force is canceled. [T] 4. The plastic deformation of rock means the deformation of the rock under the action of external force. After the external force is canceled, the deformation of the rock still retains the deformation that can not be recovered. [T] 5, when drilling, with drilling hole diameter and depth increase, drilling speed will decline. [F] 6, the gas density in the air flow can reach 1% when drilling work. [F] 7. The dynamic action of explosive means the damage caused by shock wave and stress wave produced by explosive explosion. It is often expressed by explosive force of explosive. [T] 8. Only detonating devices are allowed to be used in underground coal mines. [F] 9, the net width of the roadway is the height of the roadway 1.8m from the floor. [T] 10, the tunnel section of the pipe layout should be thick pipe on the tube in the next. [F] 11, the blasting order of tunneling is cutting out the hole first, then the peripheral eye, and finally the auxiliary eye. [T] 12, light explosion, eye mark rate of not less than 50%, over excavation size shall not be greater than 150mm. [T] 13, the local ventilation machine of tunnel driving ventilation must be installed in the fresh and dissolute roadway. [F] 14, high gas area, coal and gas outburst dangerous area, coal roadway driving face, wire rope traction rake loader. [F] 15, the gap between the volume of the drug and the hole wall is small, and the gap effect is easy to occur. [T] 16. The passivation effect of explosives of

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档