助工考试建筑施工补充题目(Assistant Engineer exam supplement the topic construction).docVIP

助工考试建筑施工补充题目(Assistant Engineer exam supplement the topic construction).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
助工考试建筑施工补充题目(Assistant Engineer exam supplement the topic construction)

助工考试建筑施工补充题目(Assistant Engineer exam supplement the topic construction) I. individual choice questions (construction supplement), individual selection questions (construction supplement) Three 1. earthwork excavation volume is 1000m, the soil known Ks=1.25, Ks =1.05, the actual 34. to determine the construction of concrete preparation strength, is to guarantee rate (C.95%) target. Three The amount of earth to be removed is (C.1250, m) 35.. When mixing the C40 concrete on the spot, the proportioning accuracy of the cement shall be controlled at (C. + 2%). 2. before the site is leveled, the primary task is to determine the design elevation of the site (B.). The 3. set of wells drainage ditch method should not be used for Slope Engineering (C. sand layer). 4., when the depth of precipitation exceeds (C.8m), the jet well point should be adopted. 5. a light well point by using the ring arrangement, the vertical distance from the well pipe buried face from foundation pit is 4m, the well point pipe to the pit center line of the horizontal distance is 10m, the depth of buried well point tube (not including pipe length should be at least) (B.5.5m). 6. according to the construction requirements of soil nailing wall, the spacing between soil nails should be (B.1 ~ 2 m). 7., a deep foundation pit, poor soil quality, high ground water level, it is better to use (D. diaphragm wall) as the soil wall support. 8., it is possible to carry out site formation, pit excavation, filling ditch, pit, soil and other operations of machinery (C. bulldozer). 9. machinery for dredging of rivers is (C. dragline). 10. in the excavation of the foundation pit (groove), the incorrect statement is that (B.) when the soil is poor, the excavation principle of layered excavation, first excavation and back support should be adopted. 11. fill if the use of different permeability soil layered filling, the lower layer should fill the permeability coefficient (D. larger) filler. 12. in filling works, the foll

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档