- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑工程逆作法(Reverse engineering construction)
建筑工程逆作法(Reverse engineering construction)
With the rapid development of the economy, high-rise buildings are springing up like mushrooms. In the construction of most basements, the traditional method of construction is adopted, that is, the excavation of the foundation pit -- the construction of the foundation pile -- the floor of the Construction -- the vertical component of the basement -- the construction of the basement beam and slab. The time spent in basement construction accounts for a considerable proportion of the entire building. In recent years, a new construction technology of reverse method is being used gradually and matured. This technology is suitable for urban construction density, adjacent buildings and the surrounding environment for settlement sensitive, narrow construction site, tight construction schedule, the thickness of soft soil foundation engineering, for the three layer and above the basement obviously.
First, the principle of reverse construction technology
The first building basement along the axis or around the construction of underground continuous wall or other support structure, while inside the building on a very laid casting or intermediate supporting pile and column, as the construction period on the bottom cover before bear the weight of the superstructure and supporting of construction load. Then, the ground floor of the beam, slab, floor structure, as the underground continuous wall stiffness support, and then down layer by layer excavation earthwork and pouring each layer of underground structure, until the bottom sealing. At the same time, because of the ground floor structure has been completed, for the construction of the upper structure to create the conditions, so you can simultaneously go up and down the ground floor structure. So the ground up and down at the same time construction until the end of the project.
Two, reverse classification
(1) the whole reverse method: using the reinforced concrete rib floor of the unde
您可能关注的文档
- 初学电子知识(Beginner electronic knowledge).doc
- 初级市场,营销就是抢地盘(The primary market, marketing is the land grab).doc
- 初级电工证考试1(Junior electrician certificate exam 1).doc
- 初级电工试题(The primary electrical test).doc
- 初级水电工理论知识试题(别人的)(The primary theoretical knowledge test (plumbers and others)).doc
- 初级设计师在设计中容易被忽略的细节(Junior designers easily overlooked in the design details).doc
- 判断发动机的几种声音(Several sound judgment engine).doc
- 初中数学目录(Junior middle school mathematics directory).doc
- 利用tinyxml进行文本解析、分词、创建索引源代码(The text analysis, word segmentation, indexing source code using tinyxml).doc
- 利用超细矿粉配制c80高强度混凝土(Preparation of C80 high strength concrete with ultra-fine powder).doc
- 建筑师命题(The architect proposition).doc
- 建筑情感空间与色彩空间的同构关系浅析(Analysis of the isomorphism between the building space and emotional color space).doc
- 建筑开槽(Slotted building).doc
- 建筑成本(The cost of construction).doc
- 建筑施工企业会计实务全功略(精彩)成本核算(The accounting practice of construction enterprises cost accounting of sina (wonderful)).doc
- 建筑施工图制图步骤和方法(The construction drawing steps and methods).doc
- 建筑施工图详解(Detailed construction drawings).doc
- 建筑施工安全生产工作汇报(The construction safety production work report).doc
- 建筑施工安全知识问答(三宝)(Construction safety knowledge quiz (San Bao)).doc
- 建筑施工实习日志2011(Log construction practice 2011).doc
文档评论(0)