- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
手机看二建市政(Mobile phone at municipal construction)
手机看二建市政(Mobile phone at municipal construction)
A single choice (a total of 70 questions, 1 points for each question. Each question in a. Only one of the most to do)
1, hammer pile sinking way ()
A heavy hammer hammer - type - B - type pile hammer hammer - pile frame
C pile frame - D heavy hammer hammer type pile frame - hammer type hammer
Solid layer soil foundation is (2,)
A replacement B net C D dynamic compaction pile
3, the road with lime dosage of lime stabilized soil refers to the lime dry weight accounted for the percentage of ().
A dry weight B lime soil lime soil heavy C dry soil D soil heavy weight
4, Chinas cement concrete pavement are used to the surface layer (concrete slab)
A B C (Su) ordinary rolling continuous reinforcement reinforced D
5, concrete pavement construction, according to concrete strength, as () mix design.
A B C compressive flexural shear tensile D
6, the pavement bearing layer is ()
A B C D base layer surface layer of Subgrade
7, take the demolition of steel tubular scaffold, should be put in the first place ()
A B C D safety cost schedule quality
8, tendons cut, do not cut ()
A B cutter wheel saw C arc D oxygen - acetylene
11, the structure section is divided into two working surface, shallow excavation method step by step check (is)
Step A method B full face method C D method in single side drift method
12, concrete water tank filled with water test, water leakage does not exceed the allowed (L/m3.d)
A 2 B 2.5 C 3 D 3.5
18, HDPE membrane impermeable layer shall not be in the (construction)
A B C D spring summer autumn winter
1-5 radio BACAB 6-10; DCCBB 11-15; AACDA 16-20; BBDAA
Two, multiple-choice questions (10 questions, 2 points for each question. For each question there are 2 options, 2 or more to do, at least 1 wrong. Wrong, this problem does not score; choose less, each option selected 0.5 points)
21, the subway tunnel shape can be divided into ()
A B C D rectangular horseshoe arch round oval E
22, should not do for senior pav
您可能关注的文档
- 怎样保护卵巢和子宫(How to protect the ovary and uterus).doc
- 怎样做一个好店长(How to be a good manager).doc
- 怎样做好小型建材市场的招商工作(How do the small building materials market investment).doc
- 怎样做英语四级真题(How do the four English exam).doc
- 怎样养好芦荟(How to raise a good Aloe).doc
- 怎样养肝护肝(How to liver).doc
- 怎样到国外打工(How to work overseas).doc
- 怎样听好数学课(How to listen to good math class).doc
- 怎样在野外分辨方向(How to distinguish the direction in the field).doc
- 怎样学习c语言(献给迷茫的c爱好者)(How to learn C language (for C lovers confused)).doc
- 手机焊接技巧(Mobile phone welding skills).doc
- 手机维修基本教程(The basic course of mobile phone repair).doc
- 手机维修基本程(Mobile phone maintenance process).doc
- 手机芯片的焊接技术(Welding technology of mobile phone chip).doc
- 手表店如何经营(How to run a watch shop).doc
- 打击非法行医专项行动方案(Special operations to combat illegal practice scheme).doc
- 打印室实习感悟(Print room practice feeling).doc
- 打印机十大故障解决方法(Ten printer troubleshooting).doc
- 打印机加墨水(Printer ink).doc
- 打印机扫描仪传真机故障(Printer scanner, fax machine fault).doc
文档评论(0)