手机看二建市政(Mobile phone at municipal construction).docVIP

手机看二建市政(Mobile phone at municipal construction).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
手机看二建市政(Mobile phone at municipal construction)

手机看二建市政(Mobile phone at municipal construction) A single choice (a total of 70 questions, 1 points for each question. Each question in a. Only one of the most to do) 1, hammer pile sinking way () A heavy hammer hammer - type - B - type pile hammer hammer - pile frame C pile frame - D heavy hammer hammer type pile frame - hammer type hammer Solid layer soil foundation is (2,) A replacement B net C D dynamic compaction pile 3, the road with lime dosage of lime stabilized soil refers to the lime dry weight accounted for the percentage of (). A dry weight B lime soil lime soil heavy C dry soil D soil heavy weight 4, Chinas cement concrete pavement are used to the surface layer (concrete slab) A B C (Su) ordinary rolling continuous reinforcement reinforced D 5, concrete pavement construction, according to concrete strength, as () mix design. A B C compressive flexural shear tensile D 6, the pavement bearing layer is () A B C D base layer surface layer of Subgrade 7, take the demolition of steel tubular scaffold, should be put in the first place () A B C D safety cost schedule quality 8, tendons cut, do not cut () A B cutter wheel saw C arc D oxygen - acetylene 11, the structure section is divided into two working surface, shallow excavation method step by step check (is) Step A method B full face method C D method in single side drift method 12, concrete water tank filled with water test, water leakage does not exceed the allowed (L/m3.d) A 2 B 2.5 C 3 D 3.5 18, HDPE membrane impermeable layer shall not be in the (construction) A B C D spring summer autumn winter 1-5 radio BACAB 6-10; DCCBB 11-15; AACDA 16-20; BBDAA Two, multiple-choice questions (10 questions, 2 points for each question. For each question there are 2 options, 2 or more to do, at least 1 wrong. Wrong, this problem does not score; choose less, each option selected 0.5 points) 21, the subway tunnel shape can be divided into () A B C D rectangular horseshoe arch round oval E 22, should not do for senior pav

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档