- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工工序方案(The construction process scheme)
施工工序方案(The construction process scheme)
The construction process of Views: 1967 reward points: 0 | question time: 2009-10-12 10:33 | questionger: 815292164
What are the construction procedures in civil engineering?
Recommendation one, construction according to 1, design and construction drawings 2, masonry construction quality acceptance specification 3, masonry engineering construction operation regulations
Two, the construction requirements (a) material requirements 1, the construction unit of the construction materials of cement, clay brick, clay brick, clay brick, high hole aerated concrete block masonry, must carry out inspection and approval procedures, supervision company checks, prohibited unqualified materials into the construction site. 2, aerated concrete block is cement gel strength to 28 days as the standard of design strength reinforced bulk, and before the age of 28 days did not reach the bulk itself, shrink rapidly. In order to avoid shrinkage cracks and ensure the quality of masonry, the aerated concrete block must reach 28 days old. (two) masonry requirements 1. The foundation walls in contact with the soil must be made of clay solid bricks. No clay big hole brick or clay porous brick shall be strictly prohibited. 2, in accordance with the requirements of the mandatory provisions of the Ministry of construction, the bathroom wall must be cast height greater than 200mm, more than C20 concrete label on the ridge. 3, other parts of infilled masonry wall, the bottom should be building height of more than 200mm of clay solid brick or precast concrete block. 4, fill masonry wall, clay hollow brick brick hole should ensure that the level of porous clay brick masonry, brick masonry should ensure the vertical hole; clay brick, clay brick, clay brick masonry in the big hole must use the day before the water soaked, aerated concrete block suitable amount of water in the surface of masonry masonry. 5, infilled masonry mortar must be strictly in accordance with
您可能关注的文档
- 改善孩子的拖延(Improve the child's delay).doc
- 改善民生一切工作的出发点和落脚点(To improve the people's Livelihood all the starting point and end point).doc
- 改善民生的财税对策思考(On fiscal and tax policies to improve the people's livelihood).doc
- 改善管理方法 控制猪传染性疾病(To improve the control of swine infectious disease management method).doc
- 改善皮肤的小窍门(Improve skin tips).doc
- 改善脑120方法(120 methods of improving brain).doc
- 改善脑力的120种方法(120 kinds of methods to improve the mental).doc
- 改善记忆力的好方法(A good way to improve memory).doc
- 改善记忆力的方法(Method of improving memory).doc
- 改善(kaizen)是一种企业经营理念(Improve (Kaizen) is a kind of enterprise management concept).doc
- 施工现场安全评价方法上的不足及其改进方法(Lack of construction site safety evaluation method and its improved method).doc
- 施工方案有合理化建议(The construction scheme is reasonable suggestions).doc
- 方正飞腾ps常用技巧(Founder Feiteng PS commonly used techniques).doc
- 施工管理奖罚细则(The construction management of reward and punishment rules).doc
- 施工管理重点(The construction management focus).doc
- 施工组织方案旧墙改造范本(Construction scheme of old wall reconstruction model).doc
- 旅游业对我国的经济影响(The economic impact of tourism in China).doc
- 旅游政策与法规复习资料(Review of tourism policies and regulations).doc
- 旅游外语系(The Foreign Language Department of Tourism).doc
- 旅游景区差异化营销策略分析(Analysis of tourism scenic spot the difference marketing strategy).doc
文档评论(0)