施工管理奖罚细则(The construction management of reward and punishment rules).docVIP

施工管理奖罚细则(The construction management of reward and punishment rules).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工管理奖罚细则(The construction management of reward and punishment rules)

施工管理奖罚细则(The construction management of reward and punishment rules) Problems, penalties I. engineering quality 1 special operations personnel without license or certificate invalid, fine 1000 yuan / person 2, no post responsibility system or responsibility is not clear, not perfect, fine 1000 yuan / times 3 no construction plan, no technical disclosure records, no hidden records (or programs, records do not meet the requirements), a fine of 100-200 yuan / times 4, according to the procedure not self inspection, not according to the standard for acceptance and transfer of a fine of 400 yuan / times 5, not according to drawings, or change the construction of a fine of 200-500 yuan / times 6 found the wrong drawings, but also according to the wrong drawings construction, fine 500 yuan / times 7 construction materials without certification, not by the designated brand, specifications approach (including time limit exit, not timely exit), a fine of 1000 yuan / times 8 brick and prefabricated panels, windows and doors, hydropower and flue without material inspection, inspection does not meet the requirements for direct project fined 1000 yuan / times 9 cement, steel, welded joint, waterproof material without inspection inspection, used directly for engineering a fine of 1000 yuan / times 10 sand, Stone mud content exceeds standard, use when not rinsed, accord with requirement, fine 100 yuan / times 11, steel contamination is not clean, fine 50 yuan / times 12, steel specifications, quantity does not meet the design requirements, fines 100 yuan / times 13, steel reinforcement floor spacing does not meet the design requirements, uneven or binding is not firm, a fine of 50 yuan / time 14, steel reinforcement banding banding number, lashing method does not meet the requirement, fine 50 yuan / time 15, steel welding does not meet the requirement, fine 50 yuan / times 16, steel lap position wrong, fine 50 yuan / time 17, steel without protection, no block, double layer net, no

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档