高层建筑结构转换层施工技术的运用(Application of construction technology of structural transfer floor in high rise building).docVIP

高层建筑结构转换层施工技术的运用(Application of construction technology of structural transfer floor in high rise building).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
高层建筑结构转换层施工技术的运用(Application of construction technology of structural transfer floor in high rise building)

高层建筑结构转换层施工技术的运用(Application of construction technology of structural transfer floor in high rise building) Application of construction technology of structural transfer floor in high rise building At present, the development of the high-rise building more and more quickly, combining with the project examples, from the aspects of the high-rise building structural transfer floor construction of formwork supporting system design and calculation, installation and reinforcement of large volume concrete are described and difficulties in the construction of the transformation of the structure, and the key points of construction quality control measures a detailed discussion. 1. General situation of Engineering Three phase of a city 15# building, 27 floors on the ground, with a total construction area of 27216m2, frame shear wall structure, the standard height of 3.0m. The structure transfer storey is made of reinforced concrete frame structure on the third floor and below the 3 floor, and the shear wall structure is above three storeys. The design level of transition layer girder concrete is C55, and the maximum transition beam cross section size is 1100mm * 1800mm, and the floor thickness is 250mm. 2, construction transfer layer construction technology and quality control measures Reinforcement, reinforced connection and binding, concrete pouring and crack control for formwork support is the key point of the engineering construction of transition layer and difficult, and this is the current research focus and difficulty of building construction personnel. The construction process of transfer floor is shown in figure 1: 2.1 formwork support system design The support system can be made of 48 steel pipe or door type. To the board bottom support, according to the vertical pole spacing not more than 1 m request erection, generally may guarantee the security. For the support at the bottom of the beam, the bearing capacity must be checked because of the large construction load.

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档