机耕路(Tractor ploughing Road)

机耕路(Tractor ploughing Road) 8.1 construction sequence According to the construction content and project characteristics of the project, the construction sequence shall be adopted from bottom to top, from low to high, from underground to ground, and complete each construction sub item. In construction, the necessary combination and coordination should be carried out according to the actual situation. 8.2 construction flow arrangement The project is divided into 3 operation sections, which are carried out simultaneously and simultaneously. 8.3 construction methods and construction process The overall construction process: the establishment of temporary facilities and access to machinery and equipment, determine the road centerline to remove and dig out the roadbed debris 8.3.1 construction survey Surveying and positioning work should be made out of a complete set of programs, fixed personnel engaged in professional. To ensure the smooth implementation of the project. 1 、 measurement control: according to the characteristics of this project, the plane and elevation control system is set up on site, so as to measure and control the construction of all projects during the whole construction period. (1) plane control system To establish plane control system using the method of wire measurement, measuring instrument using DJ2 laser theodolite and 50 meters of steel. The design of the center line pile control, set up a straight line control pile, control pile position should be stable and reliable, easy to construction period preservation and use convenience. The line control pile is preferably located on the cross section, the fast lane side and the red line. (2) elevation control system; Measuring instrument using DS3 type level, according to the design institute to provide benchmarks, will lead to the elevation of the temporary level spot, the temporary level must be strong and stable, and the distance of not more than 200 meters before and after the link, and design lev

文档评论(0)

1亿VIP精品文档

相关文档