- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
核电站可靠性维护(Reliability maintenance of nuclear power plant)
核电站可靠性维护(Reliability maintenance of nuclear power plant)
Maintenance has two meanings: maintenance of system and equipment according to the normal operation of the design; repair the failure of the system and equipment, so that the design ability to resume operation. Accordingly, maintenance is generally divided into two types: preventive maintenance and corrective maintenance. Corrective maintenance procedures are generally for fault diagnosis, temporary processing, planning, preparation, final repair and re qualification tests. Equipment failure can not be avoided absolutely, so corrective maintenance is a passive activity, so the maintenance department is working hard on preventive maintenance. The
Preventive maintenance also includes three steps: plan, implementation and test. Unlike corrective maintenance, preventive maintenance involves taking action before the system or equipment fails to avoid failure of the equipment. Preventive maintenance classification method currently has not been unified, generally divided into the following two types: the
A periodic maintenance: maintenance is performed according to a predetermined schedule (according to the maintenance manual and procedures provided by the manufacturer) without regard to the condition of the equipment. The theoretical basis of periodic maintenance is the bathtub curve of the equipment failure (see figure). T1 used to be the initial failure period, T1 to T2 is a period of accidental failure, and T2 is a period of wear and tear. Repair or replace part of the equipment before the arrival of the T2 at T3 so as to avoid the period of wear and tear. After an accidental failure, arrive at t4. T5-t3 is the cycle of equipment maintenance. The
B predictive maintenance: English, Predicative, Maintenance, literature [4] and [8] are translated as judgmental maintenance. This term is used to provide effective supervision without disassembly, especially for complex mechanical equipment in operation. It monitors the
您可能关注的文档
- 挖掘变更索赔潜力 扭转亏损实现盈利(Mining claim to reverse the loss of profit potential).doc
- 指针万用表交流电流的测量(The pointer multimeter AC current measurement).doc
- 挖掘机试题(Excavator test).doc
- 挖水井(Wells).doc
- 挠度、预拱度计算(The calculation of arch deflection, pre).doc
- 挡土墙施工方案(The retaining wall construction scheme).doc
- 挡土墙计算范例(The calculation example of retaining wall).doc
- 振动防堵器(Vibration blockage preventing device).doc
- 振波浪清立体诗探(炼意篇)【第五卷】401——500 (完整篇)((The vibration wave of Qing poetry exploration (stereo meanings articles) [Fifth - 500] volume 401 (full text) ().doc
- 捕获概念(Capture concept).doc
- 核桃树管理(Walnut management).doc
- 核辐射探测习题解答6(Nuclear radiation exploration exercise answer 6).doc
- 格里特代码审查 - 上传的变化(Gerrit code review - upload changes).doc
- 桂花树育苗技术(Sweet osmanthus tree breeding techniques).doc
- 框架结构钢模板(技术交底)(Steel formwork for frame structure (technical disclosure)).doc
- 框架结构定型组合钢模板技术交底(Frame structure stereotypes combination steel formwork technical disclosure).doc
- 框架设计注意事项(Frame design notes).doc
- 框筒与筒中筒结构特点及布置(Characteristics and arrangement of frame tube and tube in tube).doc
- 桂柳话(Guiliu).doc
- 校园网的概述(Overview of Campus Networks).doc
文档评论(0)