框架结构定型组合钢模板技术交底(Frame structure stereotypes combination steel formwork technical disclosure).docVIP

框架结构定型组合钢模板技术交底(Frame structure stereotypes combination steel formwork technical disclosure).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
框架结构定型组合钢模板技术交底(Frame structure stereotypes combination steel formwork technical disclosure)

框架结构定型组合钢模板技术交底(Frame structure stereotypes combination steel formwork technical disclosure) Shape composite steel frame structure This technology is applicable to industrial and civil construction of cast-in-situ frame shear wall structure of type steel formwork installation and removal. 1. material and equipment requirements (1) type steel template: length of 600, 750, 900, 1200, 1500mm, 150, width of 100, 200, 250, 300mm. (2): Yin and yang angle shaped steel angle mould die, connecting angle mould. (3): U card connector, L type bolt, 3 type fastener, disc type fastener, bolt, fastening bolt. (4) fixture: column hoop, hollow steel tube, corrugated shaped pillar, steel bracing, steel truss, beam bracket, wood etc.. (5) steel formwork and accessories repair should conform to quality standards. (6) isolation agent: the main use of waste oil. 2. main equipments Axe, saw, drill, hand drill, line plate hammer, by foot board, Fang Chi, iron, crowbar etc.. 3. operating conditions (1) template design: according to the engineering structure and characteristics and site conditions, the design template to determine the template layout, Vertical and horizontal keel size, number, arrangement of size, type and selected hoop column spacing, beam support spacing, template assembly form (or pre assembled in place Assembled), connection details. The stiffness and stability of formwork and support strength. Draw a full set of design templates (template plane Diagram, block diagram, assembly drawing, detail parts, processing map). Template number should be divided in according to the water section of the template design, comprehensive research The reasonable allocation of the number of templates. (2) the precast: 1) the assembly site should tamp, when conditions permit should be set up assembly operation platform. 2) were assembled in the template design, each hole adjacent two plates are used U type keel with Kaka tight, hook bolt outer disc pad The fastener and the plate rib tight h

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档