模 板 分 项 工 程(Template sub project).docVIP

模 板 分 项 工 程(Template sub project).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
模 板 分 项 工 程(Template sub project)

模 板 分 项 工 程(Template sub project) The Resort Apartments Sanya by sea breeze technical disclosure records Template sub project Concrete structure template engineering is an important process in concrete molding construction, is an important guarantee for the quality of the engineering structure, asked the construction team to seriously study the construction drawings and the construction quality acceptance, in strict accordance with the construction plan construction, careful operation, strengthen the inspection, ensure the engineering quality, are formulated as follows: Column template A, post template before installation, the first column root clean, and on the basis of control line play template line, and as a template for positioning in the column with 20 studs with short steel welding, and then install the template, with the channel steel back edge, with 16 screw pull per 70cm, and the steel tube and the full frame control column verticality. B, formed steel frame plywood, shaped steel frame and wood plywood, reinforced by steel frame and wood plywood Which frame is made of profiled steel panel, with supporting rib width 78mm, thickness 5mm, supporting rib width 6mm, 4 week 17*21 border connection hole, 300mm pitch, rib steel template pressing 60*30*3 steel rib distance is 300mm, reinforcing ribs are arranged in the left gusset plate connecting hole 17*21 ellipse hole connected with the back edge, the panel has 25 holes, wear? In the template four angle iron and with countersunk head bolt with panel connection strengthening position, panel with 25mm thick five layer plywood. Two shear wall formwork The construction of the shear wall template using removable large template, that is, the use of bolted steel skeleton, wood plywood as a large panel, the junction due to bolt connection, the template can be used after the disintegration of another use it. The following diagram for sample template, height and sizes are not consistent; at the same time reduce the h

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档