浅析桥梁桩基、承台施工关键技术(Analysis of key techniques of bridge pile foundation and platform construction).docVIP

浅析桥梁桩基、承台施工关键技术(Analysis of key techniques of bridge pile foundation and platform construction).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
浅析桥梁桩基、承台施工关键技术(Analysis of key techniques of bridge pile foundation and platform construction)

浅析桥梁桩基、承台施工关键技术(Analysis of key techniques of bridge pile foundation and platform construction) A dump truck transport to the designated dumping sites. 2.2 template installation Cap with shaped steel formwork, steel formwork is produced by professional manufacturers. In the production process, strict control of the surface roughness, assembling precision, strength and rigidity of the template to assign the producer. The template is transported to the site, to promptly organize a trial spell to make the template installation error to meet the requirements. In the model installation in strict accordance with the design drawings, model to ensure the verticality control, midline, elevation, the precision can meet the requirements of specification. Template vertical and horizontal seams, joints tight without leakage. Inside the form to use release agent. Between the formwork and steel sheet pile with 48 steel pipe support steel pipe vertical and horizontal spacing is 80cm; steel pipe and steel sheet pile with 10 * 10 square support pad. 2.3 rebar embedding and lashing Reinforced uniform processing in steel processing, transport to the construction site binding molding. In before lashing, the pile head into the anchor pull cap into a horn shape. Pay attention to the construction of binding order, arrange in advance of each reinforcement binding sequence, according to the drawings, to ensure each part of the accurate size and uniform spacing. In addition, the pier pre buried steel bars must be carried out in the cap rebar, the spot welding and pile cap, pile foundation reinforcement fixed together. If the pre buried steel pier is high, it must be in the cap around the erection of steel pipe support for supporting piers and solid steel. When necessary the pier column pre buried steel truncated pre buried, but exposing the top surface of the pile length must be greater than 35d, in the construction of pier column reinforced by rolling straight thread connection. Must be chec

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档