- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
室内给水管道安装(The indoor water supply pipeline installation)
室内给水管道安装(The indoor water supply pipeline installation)
Installation of indoor water supply pipe
This chapter applies to civil and general industrial building water supply pipes (including hot water pipes for water supply cast iron pipes and galvanized carbon steel tubes)
Engineering.
1 material requirements
1.1 cast iron pipe and pipe fittings specifications should comply with the design requirements of pressure, wall thickness uniformity, smooth and clean, no blisters,
Cracks, bristles and knots; the inner and outer diameters of the spigot and socket and the fittings shall be in good shape; the anticorrosive coating on the inner and outer surfaces shall be neat and even
Solid. Both pipe and fittings should have factory certificate.
1.2 galvanized carbon steel pipe and pipe fittings of the specifications should be consistent with the design requirements, galvanized pipe inside and outside the uniform, no corrosion, no flying thorn. tube
No partial deduction, arbitrary deduction, incomplete or inaccurate thread angle phenomenon. Both pipe and fittings should have factory certificate.
1.3 water meter specifications should comply with the design requirements and the water company confirmed, hot water system to meet the temperature requirements of the hot water meter. surface
The shell casting rules, no blisters, cracks, table glass cover damage, seal integrity, factory certification.
1.4 valve specifications, models should meet the design requirements, hot water system valve meets the temperature requirements. The body is cast with a clean surface,
No cracks, flexible shape, close tight, packing seal intact, no leakage, hand wheel intact, no damage, there is a factory certificate.
2. main machines and tools
2.1: mechanical threading machine, wheel saws, bench drill, electric hammer, electric drill, electric welding machine, electric pressure test pump.
2.2 sets of tools: wire board, Guan Qian, pressure pliers, hand saw, hammer, wrench, pliers, chain bending machine, h
您可能关注的文档
- 钻孔灌注桩施工方法_安全生产技术网(Technology of network safety construction method of bored piles _).doc
- 钻孔灌注桩缺陷处理(Bored pile; defect treatment).doc
- 钻探专业考题(Drilling professional examination questions).doc
- 钻头的磨法(Grinding of bit).doc
- 钻探工程论文(Drilling engineering paper).doc
- 钻孔灌注桩工程监理对策(Bored pile; construction supervision; countermeasure).doc
- 钻模和夹具(Jigs and Fixtures).doc
- 铁塔制造助手tma3.0(Tower manufacturing assistant tma3.0).doc
- 铁树养护手册(Any maintenance manual).doc
- 铁氧体(Ferrite).doc
- 室内设计收费标准(Interior design fees).doc
- 室内设计自学攻略大全(The interior design of self introduction Daquan).doc
- 室内设计要注意什么(Interior design should pay attention to what).doc
- 室内设计二(Interior design two).doc
- 室内设计要素1(Interior design elements 1).doc
- 家中躲地震的原则(The principle of home in the earthquake).doc
- 宫古岛(The island of Miyako Island).doc
- 家居装修的灯光设计(Home Furnishing lighting design decoration).doc
- 室内设计风格(The style of interior design).doc
- 家庭居室装饰装修工程施工项目确认表(Confirmation of the family room decoration decoration engineering construction project).doc
文档评论(0)