- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
市政设施的接驳(The connection of municipal facilities)
市政设施的接驳(The connection of municipal facilities)
Connection of municipal facilities
I. overview
Real estate development projects in the project, the annual investment plan included in the fixed assets, and then tap water company, power supply company, ThermoElectron Corporation, gas company, municipal maintenance department to make contact, the drafting of the agreement, for water supply, power supply, heat supply, gas supply, sewage discharge formalities, and pay the relevant expenses according to the provisions. In addition, in the course of construction and construction, the problems of road excavation and road occupation will also be covered.
Two, the implementation process
1. connection with water supply facilities
(1) undertaking department: Jinan water supply company;
(2) declaration materials: water application report; general plan; construction site topographic map.
(3) bid for the program: the water application report, production and Technology Department to apply for an account; the application procedures after approval, to the planning and design office for the survey and design issues; the agreement and pay the maintenance fee, tap water survey and design fees. Wait for the engineering company to arrange the construction.
(4) time limit for the implementation of the relevant provisions of the agreement between the two parties.
(5) the charging standard: the water meter used for the sale of the house is charged for the capacity increase according to the production standard. The water company is equipped with a total table according to the nature and volume of the building, and the charging standard is determined by the size of the total table diameter.
See schedule three; survey fee 50 yuan / meter; design fee can be negotiated and solved; internal standard of water supply company is 4.5% of construction cost; construction cost is determined by construction settlement value issued by waterworks engineering company.
(6) the matters needing attention: devel
您可能关注的文档
- 定时器计数器简介(The timer counter.).doc
- 宝宝大便可判断疾病(Baby stool can determine the disease).doc
- 实习参考资料 考试记得准备(Remember to practice reference test).doc
- 宝宝情商培育全面计划表(Baby EQ fostering comprehensive plan table).doc
- 宝贝家族(Baby family).doc
- 实习周记四篇(Practice weekly four).doc
- 实习工作感想体会(Internship experience.).doc
- 宜兴灌浆料(Yixing grouting material).doc
- 实习心得2(Practice 2).doc
- 实习感想(Practice feeling).doc
- 市政资料员流程(Municipal clerk process).doc
- 市级名师申报材料(Municipal Teacher application materials).doc
- 市面手机ppi,分辨率一览表(PPI mobile phone market, resolution list).doc
- 布袋风管在大空间的运用实际案例(Bag air pipe using the real case in large space).doc
- 布加氏综合征(Budd-chiari syndrome).doc
- 师德建设问答(The moral construction question).doc
- 师德标兵申报材料(The declaration materials pacesetter).doc
- 帐篷的选择与购买指南(The tent of selecting and Purchasing Guide).doc
- 带头节点的双向循环链表(A two-way circular list node to take the lead).doc
- 带式传动(Belt drive).doc
文档评论(0)