后浇带的设计、施工与接缝(With the joint design and post pouring construction) Design, construction and joint of the back pouring band At present, in the construction engineering settlement, in order to solve the needs of high and main body and the skirt of the room between reinforced concrete shrinkage and temperature deformation of concrete stress and other issues, the two poured concrete after pouring method has been widely used in construction engineering. However, there are still many problems in practical application, especially in the inconsistent design and construction regulations of the post pour