网站大量收购独家精品文档,联系QQ:2885784924

数据机房总体规划设计(Overall planning and design of data room).doc

数据机房总体规划设计(Overall planning and design of data room).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
数据机房总体规划设计(Overall planning and design of data room)

数据机房总体规划设计(Overall planning and design of data room) Abstract: data room is a need for environmental control of the space, and its only use is to accommodate equipment and direct communication with the computer system, communications systems related cables. Data room recommendation meets NFPA75 standard. Plane planning should be consistent with the requirements of the server and the equipment supplier, such as: ? floor load requirements include equipment, cables, plug lines and media (static concentrated loads, static mean floor loads, rolling disturbances, dynamic loads). ? space requirements for services (adequate clearance of service on each side of the equipment). Air flow requirements. Assembly requirements. D. DC power requirements and line length limitations. ? device connectivity length requirements (such as maximum channel length to peripheral and console) (a) position Convenient transportation There will be plenty of room construction building materials, decoration materials to transport, there are a lot of room after the completion of the machinery and equipment need to be transported, so the transportation problem is data room to consider, such as vehicles, large equipment import channel, ground bearing problems can not be ignored. Convenient communication and security mainly refers to access fiber and cable communication medium as well as the day after the use of safety and reliability etc.. Regional choice Avoid built in the days after the demolition of the construction may be built in the urban area, such as on the verge of the demolition of the area, the room was completed soon facing demolition must be painful, but if not met around the demolition, large-scale construction of computer room, the threat is not small, because the cable construction accident is not uncommon things. Floor position For the selection of floors and locations inside the building, the following conditions must be met: L. best in building two or three layer because the floor i

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档