- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
架线工程安全(二)(Safety of stringing Engineering (two))
架线工程安全(二)(Safety of stringing Engineering (two))
Safety of stringing Engineering (two).Txt
Safety of stringing Engineering (two)
3. tension stringing
(1)
The tension line is the conductor in the process, always maintain a certain tension, the wire for exhibition in the floating state, in order to maintain a certain degree of tension on the wire, will be in the lead is used to pull the wire tension machine, wire tension in the exhibition, put through the mechanical traction, zhang.
At present, 220kV line tension line is used as traction machine by walking tractor, and tension type tension machine is adopted in tension machine.
(2) the safety factor of the guide rope and the traction rope is not less than 3 times.
(3) before the tension line is released, the following work shall be examined by a special person:
The anchorage of A. traction equipment and tension equipment must be reliable and the grounding should be good.
The structure of the crossing frame in the B. stretch should be firm and reliable.
C. communication points shall not be short of post.
The pre measures of the block of the D. corner tower and the line pressing at the rising of the conductor must be reliable.
E. grounding measures for cross, parallel or near electrified bodies must comply with the requirements for safety construction technical measures (operation instructions).
(4)
A conductor after all, at both ends of the wire (i.e. traction field and tension field) on the ground near the anchor, to check whether the distance of conductors on or across the frame distance to meet the requirements of the anchor line, qualified rear can anchor line (if not, the tension machine stopped by hand hoist anchor and anchor rope connected to tighten the wire pro, anchored in the ground anchor. When the anchor wire side, not under tension due to wire outlet connection, temporary anchors, loose wire tension in the machine to form a point of view, at this time, the application of human players control hoist, pay a
您可能关注的文档
- 数字图书馆系统(Digital library system).doc
- 教你19个清洁技巧,家务从此不求人(Teach you 19 cleaning skills, housework, never ask for help).doc
- 数值分析实验算法总结(Numerical analysis experimental algorithm summary).doc
- 数字电路基础知识1(Basic knowledge of digital circuits 1).doc
- 数字脉搏电路的设计(论文)(Design of digital pulse circuit (Thesis)).doc
- 数字测图(Digital mapping).doc
- 数学儿歌(Math nursery rhyme).doc
- 数学内容资料(Mathematical content data).doc
- 数学年表2(Mathematical chronology 2).doc
- 数学英语词汇(Mathematical English Vocabulary).doc
- 新高考生物二轮复习讲练测第6讲 遗传的分子基础(检测) (原卷版).docx
- 新高考生物二轮复习讲练测第12讲 生物与环境(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第3讲 酶和ATP(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第9讲 神经调节与体液调节(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第11讲 植物生命活动的调节(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第8讲 生物的变异、育种与进化(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第5讲 细胞的分裂、分化、衰老和死亡(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第5讲 细胞的分裂、分化、衰老和死亡(检测)(原卷版).docx
- 新高考生物二轮复习讲练测第12讲 生物与环境(讲练)(原卷版).docx
- 新高考生物二轮复习讲练测第11讲 植物生命活动的调节(检测)(原卷版).docx
文档评论(0)