- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程量计算小经验(Minor experience in engineering calculation)
工程量计算小经验(Minor experience in engineering calculation)
The drawing is a regular, in the budget process, is a process of knowledge map as the main line, which is a general picture to do a picture, finish a picture to throw a map, map throw will prove picture finished, budget also finished. Therefore, the budget must be able to understand the map, and to master the order of a certain map.
First of all, there are several principles for budgeting:
1, at a time only a map, a map, as far as possible not to see second times
2, control a large number of small amount, the budget is to control the total amount of the basis, with the mapping in-depth adjustment and adjustment completed.
3, first independent, after the whole, the main meaning is to count first independent, do not deduct each other, and then there is a complex deduction relationship.
4, from the order of the map:
First, behind the ground, then on the ground;
Pre construction, post construction;
First indoors, then outdoors;
First body, rear roof, etc.
Secondly, the map is divided into five parts according to the above principles: underground, main structure, main building, roof and outdoor sporadic, corresponding to each part of calculation to determine what, what do you want to know what is determined according to the quota item and calculation rules, knowledge map can accurately calculate the engineering quantity for check. In fact, not called knowledge map, but look edges engineering calculation, after the end has finished general engineering calculation.
Finally, according to the rules of the calculation of the requirements of the deduction of relations summarized, and the whole picture to read through, to see if there is no leakage calculation, there is no duplication of calculation, there is no calculation error, and so on.
The installation is best calculated from the system from the head to the small head, or from small caliber calculation to large caliber. At the same time, all the attached lines of the s
您可能关注的文档
- 安全期避孕 让人欢喜让人忧(Safety period makes people happy and worried).doc
- 安全生产知识测试(Safety knowledge test).doc
- 安全检查的内容(Content of security check).doc
- 宇宙奥秘(Mysterium Cosmographicum).doc
- 安全生产行为规范(Code of conduct for safety in production).doc
- 安全策划书(Safety plan).doc
- 安全保卫知识(Security knowledge).doc
- 安全管理、消防安全(Safety management, fire safety).doc
- 安全经验分享(Security experience sharing).doc
- 安全规程》第一百二十八条、第一百二十九条等条的决定(Safety regulations decision of articles 128th, 129th etc.).doc
最近下载
- T∕CACM 1021.135-2018 中药材商品规格等级 桑椹.docx VIP
- 合肥南站枢纽方案.pdf
- 内蒙古自治区包头市昆都仑区2023-2024学年七年级下学期期中语文试题【含答案解析】.docx VIP
- 公司年度颁奖晚会主持词与公司年终工作总结2合集.doc VIP
- GB/T 27726-2011_热塑性塑料阀门压力试验方法及要求.pdf
- 医学生全国水平测试题库.pdf
- 2025年东莞实业投资控股集团有限公司招聘笔试模拟试题及答案解析.docx
- 《第十章-中国文化的基本精神》-课件.ppt VIP
- 基于模糊控制的智能浇灌系统设计.pptx VIP
- 乳腺癌诊治指南与规范(2025年版精要本).PDF VIP
文档评论(0)