网站大量收购独家精品文档,联系QQ:2885784924

工程量清单计价表(List of bills of quantities).doc

工程量清单计价表(List of bills of quantities).doc

  1. 1、本文档共48页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
工程量清单计价表(List of bills of quantities)

工程量清单计价表(List of bills of quantities) Annex 1: work Cheng amount clear single meter price surface Statement of use of bill of quantities 1. The bill of quantities shall be composed of the following contents 1, cover: seal -1, 2, 3, 4 2, general description: table -01 3, project budget control price (minimum bid) total price list: table -02 4, project bidding total price list: table -03 5, the completion of the project settlement total price list: table -04 6. Summary of individual project cost: table -05 7. Summary of unit project cost: table -06 8, sub item volume list and valuation table: table -07 9, list of measures items and price list: table -08 10, other items list and valuation form: table -09 11. List of material acquisition fees of tenderee: table -10 12, sporadic work list and valuation form: table -11 13, list of fees and valuation form: table -12 14, visa and claims valuation table: table -13 15, sub item volume list comprehensive unit price analysis table: table -14 16, list of measures items (two) comprehensive unit price analysis table: table -15 17. Main material price list: table -16 18, random review of the materials and price list: table -17 Two. The preparation of the bill of quantities shall conform to the following provisions 1, the preparation of the list of quantities, use forms include: seal -1, table -01, 07, 08, 09, 10, 11, 12, and 17. 2. The bill of quantities shall be compiled by the tenderee or the project cost consulting unit entrusted by the tenderee. 3. The cover shall be filled out, signed and sealed according to the prescribed contents. 4. The general instructions should be filled out as follows (1) general situation of the project: construction scale, engineering characteristics, duration of the project, actual situation of the construction site, physical and geographical conditions, environmental protection requirements, etc.. (2) bidding and subcontracting of the project. (3) the basis for compiling bill of quantities. (4) spec

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档