- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
开路达产122(Open to 122)
开路达产122(Open to 122)
Hebei Iron Steel Group Companys new No. 3 BF 5 consecutive days up production and efficiency, average daily production of 5000 tons, 27 is exceeded 6000 tons, which meet the need of new Nissan continuous sintering blast furnace No. 3 8100 tons, drum index 77%, grade rate of 73.6%, the alkalinity stability rate of 60.10%, FEO the stable rate of 68.47%, by the end of August 31st statistics, the ironmaking plant of new No. 3 blast furnace iron before each process technical indicators are maintained in stable good condition, reasonable organization of iron before the system has laid a good foundation for the production of blast furnace operation.
In order to ensure that the new No. 3 blast furnace production after production, iron before the system through the original fuel ratio to strengthen the control of ingredients, that not more than 25% TiO2 and Al2O3 and the value of blast furnace slag; stability of a coke and two coke supply, ensure the coke ratio stable at a level 70%, level two 30% coke coke in stable; furnace temperature and furnace condition, ensure the molten iron dynamic based on the reduction of fluorite amount; sintering and ironmaking raw fuel to ensure the amount of inventory, in order to reduce the number of raw material, raw material does not exceed the number of months to two times; strengthen bin management, achieve stable material into the furnace structure, do not eat blind material.
At the same time, strengthen the sinter quality control, make full use of technology in the central laboratory, adjusting the sintering raw materials must be carried out before sintering test, based on the test results, the test results in the premise of ensuring the performance index of sinter down decided to adjust the scheme, should not be arbitrarily adjusted; tracking of coke, timely analysis of the physical and chemical properties, to predict and control of blast furnace, coke quality and inventory and timely feedback, so that the company
您可能关注的文档
- 小验方(Minor recipe).doc
- 小车驾照考试题(Car driver's license examination questions).doc
- 少儿英语单词(三下)(Children's English words (three below)).doc
- 少先队入队仪式程序().doc
- 少先队员休闲生活的指导与组织_1455(The guidance and organization of young pioneers' leisure life _1455).doc
- 少儿科学课程培训中心(Children's Science Curriculum Training Center).doc
- 少先队员活动)(Young pioneers' activities)).doc
- 少先队工作计划1(Young pioneers program 1).doc
- 少先队新队员入队程序资料(The young pioneers new players into the team program data).doc
- 小红帽的故事(Little Red Riding Hood).doc
- 开蛋糕店怎样选址(How do you locate a cake shop).doc
- 开车误区细细数 车主自身扫描安全行驶(Driving errors, the number of car owners scan their own safe driving).doc
- 开车技巧100条(Driving skills 100).doc
- 开通-退订qq服务(全)(Open - unsubscribe QQ services (all)).doc
- 开餐厅的经验(Restaurant experience).doc
- 异位妊娠274例临床比较分析(Clinical comparative analysis of 274 cases of ectopic pregnancy).doc
- 式与方程2(Formula and equation 2).doc
- 引流管遗留在患者体内如何确定医患双方的举证责任(How to determine the burden of proof between doctors and patients after the drainage tube is left in the patient's body).doc
- 弘扬国术康复路(自疗亚健康)(Promote the martial arts kangfulu (autotherapy Health)).doc
- 引物分装(Primer packaging).doc
文档评论(0)