机房验收明细清单.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
机房验收明细清单

FORM 820 GENERIC TEST ACCEPTANCE CHECKLIST Site: BVAPP: Engineer: Job Vendor: Date of Installation completion: Date of Vendor Departure: Tested by: Date: ITEM YES NO Equipment Verification Frames located per floor plan Installed per drawings Equipment is what was ordered Equipment options are correct Spare equipment provided per ordering spec (if applicable) Power feed to equipment checked Workmanship Frame alignment and equipment mounting Relay rack numbering Wiring and cabling Equipment numbering and lettering Cable openings sealed Cable racks and other ironwork Power and fusing (spare fuses available also) Performance Tests Tests per recommended equipment manual Tests per Test Acceptance package sent out with job (contact the Engineer if no such package sent) Documentation As-built drawings sent back to engineering Replacement drawings Initial battery charge reports (if applicable) Equipment manuals received Original test results retained Alarms Affected alarms tested prior to work start Local and audible alarms (as applicable) tested prior to work start Remote alarms installed and tested with NROC Alarm Center (800-713-3666) Name of NROC Center Contact with whom alarms were tested: Other Comments (all No answers must be commented on) FORM 821A POWER ROOM LIGHTING TEST ACCEPTANCE CHECKLIST Site: BVAPP: Engineer: Job Vendor: Date of Installation completion: Date of Vendor Departure: Tested by: Date: ITEM YES NO 1. Lighting provided in the power areas is adequate, and located in accordance with the SITE: record lighting plan drawing 2. As a minimum, emergency and task/stumble lighting is available in stairwells, over the power board, over the engine control panel and AC transfer switch, over the AC switchgear, and in the engine room 3. Emergency and task/stumble lighting works 4. Feeding fuse/breaker positions and emergency and task/stumble lighting f

文档评论(0)

almm118 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档