网站大量收购独家精品文档,联系QQ:2885784924

地毯铺设工程施工标准!(Standard for construction of carpet laying!).doc

地毯铺设工程施工标准!(Standard for construction of carpet laying!).doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
地毯铺设工程施工标准!(Standard for construction of carpet laying!)

地毯铺设工程施工标准!(Standard for construction of carpet laying!) Carpet laying engineering construction standards!.txt16 life is a smile to face the reality, is watching over the obstacles in the future; life is to use the heart cut, cut out the green branches in the way of life; life is the face of confusion or darkness, the depths of the soul big beans are bright and smiling lights. 17, the past and the future are far away from ourselves, the key is to seize the present and seize the present. 1. the interior must be finished before the carpet is laid. All indoor heavy equipment are in place and have been debugging, running, and after verifying all reached the standards. 2. laying the floor of the ground carpet, requiring smooth surface, smooth and clean, if oil, must be wiped with acetone or turpentine. Such as cement floor, should have a certain strength, moisture content is not greater than 8%. 3. carpets, cushions and adhesives etc. approach should check to check the number of varieties, specifications, colors, patterns and so on with the design requirements such as compliance should be according to the specifications and varieties were stored in dry storage or room. Use pre - laying, matching, numbering and design. Should be laid in front of the carpet room, aisle and so on all around the baseboard do well. The construction technology of the lower foot of the skirting board Leave the ground about 8mm so that the edge of the carpet is hidden under the skirting board. 4. large area construction before the construction of a large sample and released, do the model, the model of organization according to the construction requirements of quality inspection departments to identify eligible. Operation process: 1. process Primary treatment, elastic line, set square, lattice, positioning, carpet tailoring, nail spinicarpous plate tapestry, laying carpet, cushion, detail treatment and cleaning 2. movable laying: refers to the adhesive paste in a method base, which lay the base a

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档