安装木地板准备(The installation of wooden floor ready).doc

安装木地板准备(The installation of wooden floor ready).doc

  1. 1、本文档共20页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
安装木地板准备(The installation of wooden floor ready)

安装木地板准备(The installation of wooden floor ready) In the process of renovation, the wood floor is the last working procedure of hard decoration, so in the process of the construction to Full communication and decoration in the construction of the master, before and after some small requirement is to match the decoration master, can let wood The floor reflects the beautiful appearance and satisfactory complete acceptance. The first line is installed on the floor on the ground, the ground is most affected floors juegan. Therefore, the common ground in the installation process, the following conditions must be met, in order to achieve the quality requirements and ensure the use of the floor Install the appropriate environment. The cement floor should be no dust, looks relatively dry, moisture content should be less than 2% (a geothermal system should be not more than 1.5%), wood Soft ground should be 6%-10%; The ground with 2 meters must be horizontal radius range, height error of not more than 3 mm, more than the error part must use cement or Quick dry for leveling, after leveling the ground to meet the requirements; The casing of wires and pipes should be in the cement ground under 5 mm, less than the smoothness of cement ground The ground should be clean without debris; The cement floor should be no cracking and deformation phenomena; The second is on the level of the requirements of the door. On the floor in the installation of the door shut the general decoration In order to ensure the installation after the floor, the door can be free to open, the door and the floor surface distance of not less than the floor mats + +2 mm thickness There are wires and pipes at the door after should mark the location, to prevent nail damage The third is the height of the requirements for the installation of the anchor line. The anchor line heights and floor mats and the thickness of the anchor line installation position The anchor line nailing position of wires and pipes should be m

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档