造价员宝典(The book cost member).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
造价员宝典(The book cost member)

造价员宝典(The book cost member) The cost of staff collection.Txt marriage is like free to wear a cotton padded jacket, active inconvenient, but will be warm. Love is like an onion, there is always a layer of let you cry. This paper contributed by xxdpjz. Doc document may at the WAP end of the browsing experience poor. Suggest you select TXT, or download the source file to the machine view. Building permits include: construction license and qualification; building permits including licensing conditions for approval of building projects, obtained the planning permit, construction units have been identified, construction drawings and technical materials with the permit conditions, to ensure construction quality and safety measures, construction funds implement. The validity of the construction permit: the construction unit shall get the permission of start within 3 months, if not start, should be valid to the issuing authority Shen construction permits an extension, each time does not exceed 3 months, up to 2 extensions. Suspension and resumption of construction in construction engineering security for construction, the construction units should be 1 months since the date of termination, to the issuing organ of the suspension and resumption of construction to suspend a full year to resume construction, shall be submitted to the issuing authority to check the construction permit. Unable to start on schedule for more than 6 months, should re apply for the commencement procedures. The conclusion of the contract: the principle of equality and voluntariness, fairness, honesty and credit, legal. The principle of contract bidding invitation: open class. The tenderer has issued amend the tender documents, tender documents shall be in the deadline for submission of bid documents at least 15 days prior written notice to all recipients of the tender documents. Must be bidding for projects, the tender documents to the issue date of the tender documents, the shortest is not less than 2

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档