- 16
- 0
- 约1.97万字
- 约 18页
- 2017-08-22 发布于河南
- 举报
河南省2008建筑工程定额总说明(Henan 2008 construction quota total specification)
河南省2008建筑工程定额总说明(Henan 2008 construction quota total specification)
Note the total quota of Henan province 2008 construction
First, the Henan province construction project quantity list price (2008) A construction (hereinafter referred to as the integrated unit) is based on the existing national standards construction engineering quantity list valuation specification (GB50500-2003) (hereinafter referred to as the code of valuation), in the Henan Province construction and decoration engineering in Henan (2002) on the basis of the need to adapt to the bill of quantities, according to the construction organization and construction conditions, normal and reasonable construction period, the current design specifications, construction acceptance specifications, quality standards and safety operation procedures for.
General industrial and civil buildings, two of the comprehensive price applicable to the administrative area of Henan Province, the new construction, expansion and reconstruction project.
Three, this is the comprehensive price index, design budgetary estimate and construction drawing budget, project bid price, the price bar, the completion settlement of government guidance price estimation and investment; it is the basis for implementing the bidding of engineering quantity list valuation of the construction project bidding; enterprise internal quota compilation, project cost checking, bid quotation, design and construction plan selection of reference.
Four, the construction project cost by the engineering cost (direct costs, indirect costs, profits and taxes).
Five, the implementation of the bill of quantities bidding tender bid price (or price bar) and bidding by bill of quantities project cost, project cost, project cost measures, fees and taxes.
And the cost of product line engineering quantity list the number of projects of the project quantity list and the corresponding integrated unit project price.
The project is to complete the measures of project const
您可能关注的文档
- 无公害洋葱高产栽培技术(High yield cultivation techniques of non polluted onion).doc
- 无人岛物语4修改(Unmanned Island Story 4 modified).doc
- 无公害生产之科学使用农药(Scientific use of pesticides for pollution-free production).doc
- 无公害精品苹果周年优化控制历(Annual optimization control calendar of pollution-free apple).doc
- 无功变化理论分析(Theoretical analysis of reactive power change).doc
- 无支柱花卉大棚支架 钢架大棚骨架 中原温室工程(Non pillar flower greenhouse frame, steel framed frame, central greenhouse project).doc
- 无机化学推断题与框图题解法(Inorganic chemistry deduction problem solving method and diagram).doc
- 无法删除的文件具体处理方法(Cannot delete the file specific processing methods).doc
- 无法砍去的胜利标志——v(理想信念)(A victory mark that can not be cut -- V (ideals and beliefs)).doc
- 无盘 网卡属性设置(详细)(Diskless network card property settings (details)).doc
最近下载
- 2025年单招四类考试 真题及答案.doc VIP
- JB-TB-TC6165火灾报警控制器安装使用说明书V1.1-天成.pdf
- 深度解析(2026)《GBT 29035-2022柔性石墨填料环试验方法》.pptx VIP
- JB_T 10286-2013 日光温室 技术条件.pdf VIP
- 元认知心理干预技术及应用.ppt VIP
- 2025年河北省单招四类考试试卷真题 .pdf VIP
- 实施指南(2025)《GB_T9877-2008液压传动旋转轴唇形密封圈设计规范》.pptx
- 仪表液位计PPT课件.pptx VIP
- CMC-LX软起动器中文说明书.PDF
- 2025年丽江市特岗教师招聘真题汇编附答案解析.docx VIP
原创力文档

文档评论(0)