浅谈钢管混凝土拱桥及其施工方法(Brief discussion on concrete-filled steel tube arch bridge and construction method thereof).docVIP

浅谈钢管混凝土拱桥及其施工方法(Brief discussion on concrete-filled steel tube arch bridge and construction method thereof).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
浅谈钢管混凝土拱桥及其施工方法(Brief discussion on concrete-filled steel tube arch bridge and construction method thereof)

浅谈钢管混凝土拱桥及其施工方法(Brief discussion on concrete-filled steel tube arch bridge and construction method thereof) The foundation and application of concrete-filled steel tubular structure, the bridge is more compact, more expressive but also, through the form of bridges in the city in the deck, 18 of CFST arch bridge and its construction method Get the favour. CFST arch bridge has been built and the construction of the Half Bridge City, which accounted for the vast majority of the lower bearing form The number of. 3 types of CFST arch bridge in the application. Application of steel tube concrete arch bridge in two types, one is exposed to the steel pipe, in force structure, at the same time Support the construction process and pouring concrete in pipe template, bridge closure process of steel frame, pouring concrete in tube forming arch Ring; another pipe in the construction stress, of course, also participate in the bridge stress, the bridge closure process of steel frame, and then pouring tube The concrete form of CFST, the CFST arch as buried concrete pouring, formation The main arch. Obviously, using concrete filled steel tube skeleton or formed steel as skeleton, compared with the traditional steel frame, greatly Reduce the amount of steel, reduce the weight of the skeleton. Because the main arch skeleton construction risk is instability, the stiffness requirements outstanding, The concrete filled steel tube and steel tube can solve the rigidity problem. 4. The main construction method of CFST Arch Bridge The essence of the construction method of CFST arch bridge is a rigid skeleton method, although the steel frame reinforced concrete with a lot of light, but The increase of the span, the erection of steel skeleton itself has great difficulty. In the following 100m, general component of steel frame In 3, lifting quality generally only ten tons, according to the actual situation of the floating crane, auto crane hoisting; with snap in side section The line closed, can

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档