衬砌板相关的施工方案(Construction plan of lining plate)

衬砌板相关的施工方案(Construction plan of lining plate) Zeng Ling No. two tunnel construction safety plan Seriously implement the safety first, prevention, comprehensive management approach, to ensure the construction safety of personnel and equipment, to speed up the construction of the Shanghai Kunming passenger line, prevent safety accidents, this plan is formulated. A project overview Zeng Ling Tunnel No. two, starting mileage of DK914+108 ~ DK914+607, length 499M, located in the circular curve, the maximum depth is 51m, the maximum longitudinal slope line of 20 per thousand, designed for two lane t