- 1、本文档共25页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
土方与桩工机械(Earth and pile machinery)
土方与桩工机械(Earth and pile machinery)
35 earthwork and piling machinery
35.1 general provisions
35.1.1 mechanical operation personnel must undergo safety training, after passing the examination certificates.
35.1.2 operating personnel must be approved by the examination, who suffers from high blood pressure, heart disease, epilepsy and hinder the safe operation of the disease and physical defects, shall not engage in the operation. No drunk homework.
The 35.1.3 machine before entering into the site, must find out the traffic bridge on the route, driving height of culvert and bearing capacity. Is strictly prohibited on the deck and the emergency brake emergency steering. Through the bridge before must pay attention to the high limit, to confirm the safety of the low speed.
35.1.4 before operation in accordance with the technical measures for safety inspection of the construction site construction, find out the ground, underground pipelines and structures of the situation. Not work within the distance of power communication cable, for example pipeline around 2m.
The 35.1.5 mechanical equipment running in near the trench should be low, operation must be avoided in pipelines and structures, and keep a safe distance not less than 1.5m and the groove edge.
35.1.6 with the mechanical clear bottom, flat and slope repair personnel must operate outside the mechanical radius of gyration. If it is necessary to work in the swing radius, and good mechanical rotary brake should stop before the beginning. Machine, machine should be made in close contact.
35.1.7 encountered the following operation, should immediately stop operation:
1. cut fill soil is not stable, may have collapsed.
2. heavy rain, lightning, floods and water level rise.
3. construction marks and protective facilities damaged.
4. other work and can not guarantee the safe operation of the situation.
The relevant provisions of the presence of 35.1.8 mechanical driving on the road must comply with the traffic management de
您可能关注的文档
- 魔术师的基本技能.doc
- 魔术师的大象.ppt
- 魔术晚间规划书.doc
- 魔术店经营策略.pdf
- 魔术气球狮子插图.doc
- 魔术学会章程.doc
- 魔术知识和经验.doc
- 魔术课第一课计划.doc
- 魔术的五大优势 - 魔术巨人.pdf
- 魔术泡泡表演.ppt
- 央国企价值提升系列研究之二:央国企并购重组及展望.docx
- 迎驾贡酒生态洞藏拾级而上,连创佳绩百亿在望.docx
- 周期的钟摆:中国产能周期历史与现状.docx
- 转债,指数级别机会.docx
- 仙乐健康公司深度研究:研发制造并重,国内海外兼修,全球布局的营养保健食品CDMO龙头.docx
- 非白酒行业大众品24Q4策略暨24Q3业绩前瞻:低增速下牛市三阶段.pdf
- 被低估的省直管县城投.pdf
- 资金跟踪系列之一百三十八:市场热度与波动率明显回升,两融大幅回流-240930-民生证券.docx
- 影视院线行业动态:乘消费东风,享内容供给增加,左侧布局电影板块-240930.docx
- 以旧换新政策驱动,国庆家电消费实现良好增长.docx
最近下载
- 合理使用手机主题班会省公开课一等奖全国示范课微课金奖PPT课件.pptx
- 试卷3试卷答案4《运营管理(新形态版) 》_刘蕾曹俊玲.docx VIP
- 数学新课标2022版学习重要知识点考点总结 数学新课标最新版重点知识复习总结.docx
- 2023年中考语文二轮复习:文言文阅读 司马迁《史记》专项练习题汇编(Word版,含答案).docx
- 2024年中级银行从业资格考试《银行管理》真题汇编试卷(文末含答案解精品.pdf VIP
- 乡镇宣传工作总结PPT.pptx VIP
- 2024年疾控大学习突发公共卫生事件监测答案.docx VIP
- 车间冬季安全培训.pdf VIP
- 长阳路排水管道修复监理细则.pdf
- 你是这样的人降B正谱子五线谱乐谱曲谱歌谱高清.pdf
文档评论(0)