土方与桩工机械(Earth and pile machinery).doc

土方与桩工机械(Earth and pile machinery).doc

  1. 1、本文档共25页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
土方与桩工机械(Earth and pile machinery)

土方与桩工机械(Earth and pile machinery) 35 earthwork and piling machinery 35.1 general provisions 35.1.1 mechanical operation personnel must undergo safety training, after passing the examination certificates. 35.1.2 operating personnel must be approved by the examination, who suffers from high blood pressure, heart disease, epilepsy and hinder the safe operation of the disease and physical defects, shall not engage in the operation. No drunk homework. The 35.1.3 machine before entering into the site, must find out the traffic bridge on the route, driving height of culvert and bearing capacity. Is strictly prohibited on the deck and the emergency brake emergency steering. Through the bridge before must pay attention to the high limit, to confirm the safety of the low speed. 35.1.4 before operation in accordance with the technical measures for safety inspection of the construction site construction, find out the ground, underground pipelines and structures of the situation. Not work within the distance of power communication cable, for example pipeline around 2m. The 35.1.5 mechanical equipment running in near the trench should be low, operation must be avoided in pipelines and structures, and keep a safe distance not less than 1.5m and the groove edge. 35.1.6 with the mechanical clear bottom, flat and slope repair personnel must operate outside the mechanical radius of gyration. If it is necessary to work in the swing radius, and good mechanical rotary brake should stop before the beginning. Machine, machine should be made in close contact. 35.1.7 encountered the following operation, should immediately stop operation: 1. cut fill soil is not stable, may have collapsed. 2. heavy rain, lightning, floods and water level rise. 3. construction marks and protective facilities damaged. 4. other work and can not guarantee the safe operation of the situation. The relevant provisions of the presence of 35.1.8 mechanical driving on the road must comply with the traffic management de

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档