建设项目管理案例(Case study of construction project management).docVIP

建设项目管理案例(Case study of construction project management).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建设项目管理案例(Case study of construction project management)

建设项目管理案例(Case study of construction project management) Today, all the problems in enterprise management, all aspects, squeeze us, how to break through? How to easily deal with the workplace, deal with management? Predecessors trees, descendants cool, how to get inspired from the previous business case, the famous construction project management training expert Tan Xiaofang teacher summarized ten cases of construction project management: The energy storage power station construction project management of Tongbai pumped Pumped storage power station is the electric power construction project Zhejiang Electric Power Corporation, Zhejiang Province, East China Power Development Co., Ltd., Shanghai Municipal Electric Power Company and its Shenneng Tiantai County Government jointly invest in the construction of Tongbai pumped. Located in Tiantai County of Zhejiang Province, is December 2001 the State Council approved the construction of the Zhejiang Province second large pumped storage power station. Power plant installed capacity of 1 million 200 thousand KW power plant, built after the two or three Qinshan nuclear power production and transmission of Three Gorges power station gradually, has double peak function, and has good economic and social benefits, is the ideal peaking power grid. The energy storage project is the general contractor of the project of Zhejiang electric power construction company of Tongbai pumped, construction and equipment responsible for construction project bidding, production preparation, construction management etc.. Plant early build the information system of Tongbai pumped storage power, and the use of project management software. However, with the Tongbai pumped storage power station construction project in depth, the amount of information increases, the original project management software is lack of strong support of the enterprise information management system, enterprise basic information resources can not be shared with project managem

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档