高速铁路路基施工方案(Construction scheme of subgrade for high speed railway).docVIP

高速铁路路基施工方案(Construction scheme of subgrade for high speed railway).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
高速铁路路基施工方案(Construction scheme of subgrade for high speed railway)

高速铁路路基施工方案(Construction scheme of subgrade for high speed railway) Construction construction design of subgrade construction * * line * contract section, project department, engineering section Construction construction design of subgrade construction I. engineering content The number of the starting and stopping piles in this section is DK344+173.58-DK358+600, with a total length of 14.30 In addition, 4.8 kilometers of roads have been changed, and the main contents of subgrade construction are Subgrade Earthwork and existing lines Foundation reinforcement and protection construction. The earthwork construction of subgrade mainly includes interval earthwork, station yard earthwork and aggregate sandy gravel This section contains three new double winding, respectively: K345+900 to K349+200, K354+900 to K357+100, K357+400 to K358+600. 400 thousand sides of earthwork, There are 450 thousand sides of earthwork, 80 thousand pieces of graded crushed stone soil Water system, slope protection, drainage system 6 thousand sides, slope protection 15 thousand party. Two. Hydrology and meteorology This section is a subtropical monsoon broad-leaved forest climate, warm and humid, abundant rainfall, The annual average temperature is 16 ~ 20 degrees centigrade, the annual maximum temperature is 39 ~ 42 degrees, and the annual minimum temperature -8 to -11 DEG C, the hottest month average temperature 28 to 30 DEG C, the temperature and rainfall along the East Slightly higher than the west, with an average annual rainfall of 1400~1800 mm, along the monsoon affected. Winter temperature is low, winter construction measures must be taken in winter, summer rainfall, Construction must be effective measures to ensure the progress of construction. Three 、 construction plan and technical measures 1, subgrade construction program summary: The construction plan of the bid section shall be based on the Provisional Regulations for the design of the railway passenger and freight trains with a spe

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档