管道布置经验(Piping layout experience)
管道布置经验(Piping layout experience)
The arrangement of piping layout is a very careful work, and my experience is as follows:
1, first of all, we should know the function of this section, the number of equipment, the number of pipes and so on, and then according to the equipment layout in mind there is a general direction of the main pipeline, to consider whether the need to set up the middle pipe gallery.
2, but also familiar with the piping standards and specifications, to be very detailed, specific to the adjacent pipe spacing, pipes and similar structures, spacing, pipe frame settings, valve stem height, etc. should know.
3, start drawing, improve equipment layout, control flow chart, start with the line. (when I was drawing more stringent requirements on their own, because if people use CAD not very skilled, the pictures will have deviation, construction cannot be guaranteed, of course the use of 3D Piping accuracy is needed.) Start piping in accordance with relevant piping regulations.
4, attention should be paid to the flow chart, there are special instructions, such as the need for U shaped bend, slope and other requirements.
5, when the tube spacing of adjacent piping, check several points, there are side by side non thermal insulation pipe, flange flange staggered non thermal insulation pipe insulation pipe, flange side tube, flanges staggered, need to see clearly.
6, I think there is also very important, a good designer is a good operator, should always thinking from the operators point of view, to facilitate the operation, this product will not bring trouble to the operation. In the scene also often see, some valves superior, and some valve handle back to people, and so on, can not operate.
Replenish oneself:
1 、 piping engineering design content include: device layout design, piping design, pipe, pipe machine (stress analysis);
2, the need to consider the pipe on the control valve group, instrument tube mouth, flow orifice, sampling and heat transfer pipel
您可能关注的文档
- 禁针禁灸(Forbidden moxibustion).doc
- 福州黄山前山科目二考试经历(Fuzhou Mount Huangshan Front Mountain subjects two exam experience).doc
- 福师11春学期《分子生物学》在线作业一(Fu Chun division 11 spring semester molecular biology online homework).doc
- 福师10秋学期《学前儿童体育教育》在线作业一(Fu Shi 10 autumn semester pre-school children sports education online homework).doc
- 福师《体育保健学》在线作业一(Fu Shi Sports Health Science online homework).doc
- 福师《体育测量与评价》在线作业一(Fu Fu division sports measurement and evaluation online homework).doc
- 福师《听力口译(二)》在线作业二(Fu Fu listening comprehension (two) online homework two).doc
- 福师《学前卫生学》在线作业一(Fu Qin pre-school hygiene online homework).doc
- 福师《刑法学》在线作业一(Fu Fu criminal law online homework one).doc
- 福大生化题(Fu biochemical problems).doc
- 国际标准 IEC 61169-47:2015 EN Radio-frequency connectors - Part 47: Sectional specification for radio-frequency coaxial connectors with clamp coupling, typically for use in 75 Ω cable networks (type F-Quick) 无线电频率连接器 - 第47部分:用于无线电频率同轴连接器的部分规范,.pdf
- 国际标准 IEC 61158-5-17:2007 EN 工业通信网络 - 现场总线规范 - 第5-17部分:应用层服务定义 - 类型17元素 Industrial communication networks - Fieldbus specifications - Part 5-17: Application layer service definition - Type 17 elements.pdf
- 国际标准 IEC 61158-5-17:2007 EN Industrial communication networks - Fieldbus specifications - Part 5-17: Application layer service definition - Type 17 elements 工业通信网络 - 现场总线规范 - 第5-17部分:应用层服务定义 - 类型17元素.pdf
- 国际标准 IEC 60939-2-2:2004 EN_D 完整抑制无线电干扰滤波器单元-第2-2部分:空白详细规范-用于抑制电磁干扰的被动滤波器单元-仅需进行安全测试的滤波器(安全测试) Complete filter units for radio interference suppression - Part 2-2: Blank detail specification - Passive filter uits for electromagnetic interference .pdf
- 国际标准 IEC 60939-2-2:2004 EN_D Complete filter units for radio interference suppression - Part 2-2: Blank detail specification - Passive filter uits for electromagnetic interference suppression - Filters for which safety tests are required (safety.pdf
- 国际标准 IEC 60670-23:2006 EN-FR Boxes and enclosures for electrical accessories for household and similar fixed electrical installations - Part 23: Particular requirements for floor boxes and enclosures 家用和类似固定电气安装用电器配件的盒子与封闭装置——第23部分:地板箱和封闭装置的要求.pdf
- 国际标准 IEC 60670-23:2006 EN-FR 家用和类似固定电气安装用电器配件的盒子与封闭装置——第23部分:地板箱和封闭装置的要求 Boxes and enclosures for electrical accessories for household and similar fixed electrical installations - Part 23: Particular requirements for floor boxes and enclosures.pdf
- 2024版完整的货物运输合同书.doc
- 2024版无财产的离婚协议书书模板.doc
- 2024版委托融资租赁合同书书.doc
文档评论(0)