墙面拉毛灰施工工艺(907-1996)(Grey wall galling construction technology (907-1996)).docVIP

墙面拉毛灰施工工艺(907-1996)(Grey wall galling construction technology (907-1996)).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
墙面拉毛灰施工工艺(907-1996)(Grey wall galling construction technology (907-1996))

墙面拉毛灰施工工艺(907-1996)(Grey wall galling construction technology (907-1996)) This technology is applicable to general industrial and civil building construction wall brushed ash. The 2.1 main materials and equipment: 2.1.1 cement: the No. 325 ordinary portland cement and Portland slag cement, using the same batch of cement. 2.1.2 sand: the sand, 5mm aperture sieve, shall not contain the root, impurities such as organic matter in. 2.1.3 admixture: lime and fly ash, ground quick lime powder. Such as the use of lime cream for lime paste, the curing time is not less than 30D. As the 100 ash mixing mortar, then the curing time is not less than 3D. 2.1.4 water: the tap water or clean water containing harmful substances. 2.1.5: 107 adhesive glue, polyvinyl acetate emulsion etc.. 2.1.6 main equipment: blender, iron (mix ash), 5mm sieve, shovel, spade, shovel, big Xiaoping pick, spoon, ash ash bucket, ash iron trowel, wood trowel, bar, bar, small load plate, line bag and a small bucket, broom, steel clip, trolley, rubber hose eight, on foot, case etc.. 2.2 operating conditions: The structure of 2.2.1 project completed. And after the acceptance of qualified structure. 2.2.2 decoration shelf must be adjusted according to the need of napping construction steps and the height of non reserved holes in the wall and construction of foot hand eye on. 2.2.3 at room temperature during the construction of walls must be watered, and the dust and dirt to clean up the wall. 2.2.4 front door window should be installed ahead of plastering, and check the installation position and the installation firm degree, meet the requirements, with 1 to 3 of cement mortar will crack Windows and wall connection plug and tightly blocked. If the gap is large, should be in the mortar mixed with a small amount of hair impaction compacting. Processing windows and wall Aluminum Alloy connection gap should be filled according to the requirement of design. 2.2.5 balcony, hanging on the wall of the pre buried iron,

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档