analysis of the municipal sewer construction project management(分析市政下水道建设项目管理).doc

analysis of the municipal sewer construction project management(分析市政下水道建设项目管理).doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
analysis of the municipal sewer construction project management(分析市政下水道建设项目管理)

Analysis of the municipal sewer construction project management [Abstract] safety and quality of municipal sewage pipe network construction a top priority. Municipal sewage pipe network construction management should adhere to the drawings, Atlas, and related specifications for the control of the basis, through the sub-segment and concealed work, the overall construction quality control. At the same time should always do a good job safety management. [Keywords] sewer construction management safety management quality control Municipal wastewater pipeline project as the city an important part of public works, is a function of the basic elements of the city, through the sewage pipe network to collect sewage treatment discharge standards, to avoid misplacing the sewage discharge chaos, protect the living environment, therefore, control Good sewage pipe network construction quality is directly related to a city’s image and environment, directly affect the lives of urban residents. control the quality of construction, construction management do a good job, we should first do the pre-construction preparation work by the sub-projects quality checks at each level, the final completion of Sanda acceptance. First, the municipal sewage pipe network features First, both sides of the road in the city, close to all types of buildings, in the past quite a large number, the second is more ground obstacles, a variety of underground pipelines cross, coordinating a larger workload, three sewage is gravity drainage, the sewage pipe network higher elevation, four sewer trench is deeper, more security risks, five sewage contains a variety of harmful substances, in order to avoid pollution of groundwater, the tightness of the pipe network are higher, six are sewer projects often require removal of the original sidewalk or in the new sidewalk, the ground in order to avoid future depressions, backfill requirements for the construction of a high. Second, the muni

您可能关注的文档

文档评论(0)

jiupshaieuk12 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6212135231000003

1亿VIP精品文档

相关文档