7.工期保证措施(7. time limit guarantee measures)
7.工期保证措施(7. time limit guarantee measures)
7.1 schedule setting control points
In order to ensure the implementation of the master plan, we in the overall network planning set up key construction control points: such as pile cap. Completion date of completion date. The completion date. The date of completion of pier abutment. Beam. Beam Deck completion date of completion date. The control points of the target is construction stage, is the preparation of the professional schedule.
7.2 to start the preparatory work before
(1) received a letter of acceptance, we immediately with the owner and supervision unit design. Contact, obtaining the site coordinates of control points layout and location as soon as possible, ready for entering the measurement positioning. Full circle design drawings, organization as soon as possible, optimizing the construction organization design, construction ready for.
(2) to develop a detailed work plan construction preparation, site layout planning as soon as possible plane, water pipeline, erection of temporary production. Living facilities. The conditions have started as soon as possible.
7.3 optimization of construction scheme
(1) fully familiar with the design drawings of the project, the construction organization design. The more serious analysis of the construction scheme and method, with the main structure as the key point, pile foundation construction. Construction of prestressed concrete construction. Pier is difficult, the construction organization optimization.
(2) according to the characteristics of the project, to take corresponding measures to improve the construction progress of the main project, such as construction of concrete with high early strength Jianshuiji, improve the early strength of the concrete structure, shorten the construction period; the pier shaped steel formwork support. Buckle down the bowl scaffold early stripping system.
(3) reasonable to increase investment, improve the level of mechanization, fully meet
您可能关注的文档
- 24节气养生歌(24 solar Health Song).doc
- 25《夜莺的歌声》教学设计之一(25 one of the teaching designs of the song of the Nightingale).doc
- 25个好习惯让你美丽一生(25 good habits make you beautiful all your life).doc
- 25场地设计(25 site design).doc
- 25岁知道就晚了写给全球年轻人的90条幸福定律(25 is too late the 90 laws of happiness for young people around the world).doc
- 25种獭兔饲料配方(25 rabbit feed formula).doc
- 26-诸真圣号宫阙(26-, the true saint).doc
- 26《一定要争气》(26, must live up to expectations.).doc
- 27-海洋可再生能源专项资金管理暂行办法(Interim Measures for the administration of 27- special funds for marine renewable energy).doc
- 27001与7799差异(27001 and 7799 differences).doc
- 国际标准 IEC 61169-47:2015 EN Radio-frequency connectors - Part 47: Sectional specification for radio-frequency coaxial connectors with clamp coupling, typically for use in 75 Ω cable networks (type F-Quick) 无线电频率连接器 - 第47部分:用于无线电频率同轴连接器的部分规范,.pdf
- 国际标准 IEC 61158-5-17:2007 EN 工业通信网络 - 现场总线规范 - 第5-17部分:应用层服务定义 - 类型17元素 Industrial communication networks - Fieldbus specifications - Part 5-17: Application layer service definition - Type 17 elements.pdf
- 国际标准 IEC 61158-5-17:2007 EN Industrial communication networks - Fieldbus specifications - Part 5-17: Application layer service definition - Type 17 elements 工业通信网络 - 现场总线规范 - 第5-17部分:应用层服务定义 - 类型17元素.pdf
- 国际标准 IEC 60939-2-2:2004 EN_D 完整抑制无线电干扰滤波器单元-第2-2部分:空白详细规范-用于抑制电磁干扰的被动滤波器单元-仅需进行安全测试的滤波器(安全测试) Complete filter units for radio interference suppression - Part 2-2: Blank detail specification - Passive filter uits for electromagnetic interference .pdf
- 国际标准 IEC 60939-2-2:2004 EN_D Complete filter units for radio interference suppression - Part 2-2: Blank detail specification - Passive filter uits for electromagnetic interference suppression - Filters for which safety tests are required (safety.pdf
- 国际标准 IEC 60670-23:2006 EN-FR Boxes and enclosures for electrical accessories for household and similar fixed electrical installations - Part 23: Particular requirements for floor boxes and enclosures 家用和类似固定电气安装用电器配件的盒子与封闭装置——第23部分:地板箱和封闭装置的要求.pdf
- 国际标准 IEC 60670-23:2006 EN-FR 家用和类似固定电气安装用电器配件的盒子与封闭装置——第23部分:地板箱和封闭装置的要求 Boxes and enclosures for electrical accessories for household and similar fixed electrical installations - Part 23: Particular requirements for floor boxes and enclosures.pdf
- 2024版完整的货物运输合同书.doc
- 2024版无财产的离婚协议书书模板.doc
- 2024版委托融资租赁合同书书.doc
文档评论(0)