双管压密注浆在深基坑侧向渗漏中的应用实例(Application of double pipe compaction grouting in side leakage of deep foundation pit).docVIP

双管压密注浆在深基坑侧向渗漏中的应用实例(Application of double pipe compaction grouting in side leakage of deep foundation pit).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
双管压密注浆在深基坑侧向渗漏中的应用实例(Application of double pipe compaction grouting in side leakage of deep foundation pit)

双管压密注浆在深基坑侧向渗漏中的应用实例(Application of double pipe compaction grouting in side leakage of deep foundation pit) Abstract: the application of double pipe compaction grouting in deep foundation pit side leakage Key words: deep foundation pit; leakage; grouting General situation of Engineering A two storey basement is located in a downtown area of Hangzhou. According to the enclosure design, the elevation of the foundation pit of the foundation pit is 10.22m, the natural elevation of the site is 0.30m, and the actual excavation depth is converted from 9.1 to 9.7m. Engineering geology: -1 miscellaneous fill, gray, brown, wet to saturation, loose, with brick rubble about 35 ~ 40%, 10 ~ 15cm with local bulk rock fill concrete floor surface, is 15cm thick, thick soil layer of 3.5 ~ 5.7m, the permeability coefficient of 5x10-5cm/s; -2 soil, grey brown, deep grey, saturated, loose, containing a small amount of brick dust, organic matter, the thickness of 0.4 ~ 2.1m, the permeability coefficient of 5x10-5cm/s; the sandy soil, yellow gray, gray, saturated, slightly dense, containing a small amount of mica debris, iron oxide and organic matter, the thickness of 2.3 ~ 4.6m, permeability coefficient 3.8x10-5cm/s, the void ratio is 0.46; silty clay, gray plastic, organic matter and a small amount of shell fragments, with a small amount of silt layer, the thickness of 5.8 ~ 8.2m; survey measured during a dive depth of 0.85 ~ 1.20m. Retaining piles used in the design of the 800 large diameter bored pile, 1000mm pile spacing, pile bottom elevation 17 ~ 18.4m, the foundation set two reinforced concrete truss support, concrete girder of main section of 700mm * 700mm, 700mm * 800mm, bottom elevation were 2.70m and 7.10m, waterproof curtain most of the 500 double cement mixing piles, piles of overlapping 10cm, the pile bottom elevation of - 12.6 to - 13.2m, in part by the phi 800 high pressure jet grouting pile embedded pile sealing, the inner row Phi 500 cement mixing pile and retaining pil

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档