on the highway construction quality control system and security management strategy analysis(在高速公路施工质量控制系统和安全管理策略分析).docVIP

on the highway construction quality control system and security management strategy analysis(在高速公路施工质量控制系统和安全管理策略分析).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
on the highway construction quality control system and security management strategy analysis(在高速公路施工质量控制系统和安全管理策略分析)

On the highway construction quality control system and security management strategy analysis [Abstract] This paper describes the current highway construction management problems, and then based on this construction quality control on the highway system for a preliminary discussion, and finally a detailed study of the safety of highway construction management strategy. First, the current highway construction management problems 1, failed to comply with the construction management program Construction management, there is the first report after the start of the phenomenon. Some of the construction unit accustomed to the traditional approach, do not open before the project starts construction work report or side edge of open public report or the report submitted to start it without the approval of the construction, serious violation of the construction supervision of the program. Another problem is the first test and then a test report on the application of the phenomenon have occurred. combined with some strong sense of responsibility, supervision, supervision and poor management, no pre-made quality control application, the Commissioner has made a quality work, in violation of the construction supervision procedures. In addition, there is no test case required frequency in the embankment and the ‘three back’ (the back wall of the bridge back, Han back filling process must be strictly required control layer thickness and filling degree of compaction, each layer of filling end, the degree of compaction of the layer must be self-reported to the Commissioner of sampling, the degree of compaction after passing a layer of filling, but it only emphasizes the construction of some progress, according to the specified frequency for self-inspection, supervision is not required sampling frequency, which is obviously contrary to the construction supervision procedures. 2, weak, and management awareness is not high quality managers Over the years, the project con

您可能关注的文档

文档评论(0)

wnqwwy20 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:7014141164000003

1亿VIP精品文档

相关文档