- 1、本文档共19页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
protaper的操作流程(Operation flow of ProTaper)
protaper的操作流程(Operation flow of ProTaper)
Operation flow of Protaper
Operation flow of Protaper
A. open marrow
B. uses 10# and, 15#, Kfile, or, K, reamer to explore and build root canals.
C. if the 15# file reaches the working length, the root canal is shaped directly;
If the 15# file does not reach the working length, use the S1 and SX file to establish the root canal crown 1/3 straight line channel
Be careful:
1.S1 shall not exceed the depth of the 15# file;
2. when the orifice of the root canal is narrower, it is suggested that S1 and SX be used to make the root canal orifice;
3. for short roots with a length less than 14mm, SX should be used instead of S1 (because the working length of S1 is only 14mm)
D. re explore the root canal to determine the length of the work.
Be careful:
1. when measuring the length, keep the marrow cavity dry and keep the humidity in the root canal;
2. of the patients tongue and lips can not touch the needle, measuring the needle can not be contacted with other instruments
E. uses S1 file for root canal crown 1/3 preparation
F. uses S2 file to prepare the 1/3 in the root canal
G. prepares the root canal tip 1/3 with the F1 file
Be careful:
1., when you start using the NI-TI instrument, rotate 1/4 to 1/2 turns each time to prevent the instrument from breaking
2., in case of resistance, should be removed in time to remove the file surface of the dentin chip.
3. each preparation must reach the length of the work.
4. every time after the completion of the preparation, you should do a good job of washing.
Try the 20# gutta percha tip. If the 20# gutta percha tip reaches the working length, the root canal preparation has been completed and root canal filling can be performed.
H.
If the apical foramen is larger, the 20# gutta percha points exceed the apical foramen, and the F2 file should be used for the preparation of the apical region so that the 25# gutta percha tip can reach the proper filling.
I. if the apical foramen is large, the 25# gu
您可能关注的文档
- imba(IMBA).doc
- id 32 staph 葡萄球菌的鉴定系统(ID 32 Staph staphylococcal identification system).doc
- iis无法安装(IIS cannot install).doc
- idata_一部别具特色的词典_评_易混同音近音词解析词典_王芳智(Idata_ is a unique _ rating _ dictionary easy mixed words dictionary _ homophone analytic Wang Fangzhi).doc
- internet 的影响(the internet 的影响).doc
- ioc与di(ioc与di).doc
- inter应用 考试大纲_考试大纲_上海市干部培训中心(The application of inter _ syllabus syllabus _ Shanghai cadres training center).doc
- ipad2你不可不知的26个使用小技巧(Ipad2 you must not know the 26 little tricks used).doc
- ipad使用技巧(IPad usage skills).doc
- ipad2和ipad有什么区别和不同(What are the differences and differences between ipad2 and iPad).doc
- DB5334_T 12.2-2024 地理标志证明商标 香格里拉藏香猪 第2部分:繁育.docx
- DB5306_T 114-2023 苹果乔砧密植纺锤树形管理技术规范.docx
- DB41T2582-2024 湖北紫荆培育技术规程.docx
- DB4113_T 046-2023 独山玉工艺品雕琢技术要求.docx
- DB43_T 2759-2023 稻茬烤烟施肥技术规程.docx
- DB50T1011.1-2020 丘陵山地农村生产生活废弃物处理利用技术规程 第1部分:农作物秸杆.docx
- DB64_T 1886-2023 甜荞麦良种繁育技术规程.docx
- DB64T 1936-2023 林下平菇栽培技术规程.docx
- DB64╱T 838-2013 重力滴灌节水技术规程.docx
- DB45_T 2487-2022 供港澳苋菜设施生产技术规程.docx
文档评论(0)