底喷流化床(wurster)包衣的操作要点 !(The operation points of bottom jet fluidized bed (Wurster) coating!).docVIP

  • 53
  • 0
  • 约1.25万字
  • 约 14页
  • 2017-09-07 发布于河南
  • 举报

底喷流化床(wurster)包衣的操作要点 !(The operation points of bottom jet fluidized bed (Wurster) coating!).doc

底喷流化床(wurster)包衣的操作要点 !(The operation points of bottom jet fluidized bed (Wurster) coating!)

底喷流化床(wurster)包衣的操作要点 !(The operation points of bottom jet fluidized bed (Wurster) coating!) The operation points of bottom jet fluidized bed (Wurster) coating Maintaining normal fluidization is a prerequisite for successful coating operations The normal fluidization state has the following characteristics: (1) the particles flow rapidly through the draft tube up to the highest possible height, but a large number of particles do not touch the top filter (or filter bag); (2) the particles on the outer side of the draft tube are suspended on the upper part of the base plate, and the particles move downward continuously from one layer to another without any retention or severe boiling. (3) the particle density in the draft tube is neither dense nor sparse. In order to meet the above requirements, the following two points should be noted in addition to the proper control of incoming air flow: (1) a suitable air distribution plate bottom fluidized bed should be provided with 3-4 openings with different gas distribution plates. The total area of the central hole total area and peripheral area of these holes distribution plate ratio of different. When the feeding volume, particle size and particle proportion are relatively large, the distribution panel with relatively small hole and relatively large area should be selected, so as to avoid the retention of particles in the surrounding area. If you replace all other distribution board cannot eliminate peripheral particle retention, as a matter of expediency, available a number of tape sealing central holes, the surrounding area air increased, can eliminate particle retention. On the contrary, should choose the bottom plate hole total area is relatively small, can also be used when necessary, several tape sealing periphery holes, not the surrounding area; the violent boiling particles also can make particles through the guide tube to rise even higher. (2) adjusting the distance between the lower end of the guide pipe and the

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档